ISS On-Orbit Status Report

ISS Daily Summary Report – 02/21/15

Extravehicular Activity (EVA) 29: Wilmore and Virts accomplished all International Docking Adapter (IDA) Cable Deploy objectives associated with EVA 29 within a Phased Elapsed Time (PET) of 6 hours 41 minutes. Cristoforetti and Shkaplerov assisted during suit donning and doffing activities. Joint Airlock egress took place at 6:45am CST and post EVA ingress and hatch closure occurring at 1:17pm CST. The EVA did not require Space Station Remote Manipulator System (SSRMS) task support, although ground commanded SSRMS cameras views were available through the day. The objectives accomplished during today’s EVA are as follows:

  • PMA2 Port Umbilical Re-route
  • Install IDA Cables under Port and Starboard Shields
  • Deploy IDA Cables from PMA-2 to the Lab Forward End Cone
  • Get ahead task: EVA Inhibits for IDA 1 Cables – Partially completed

Astro Palate: On Friday,Virts retrieved a specialAstro Palate prepackaged meal, consumed it as his midday meal and then completed the Mood and Food Consumption/Satisfaction Questionnaires. Factors Contributing to Food Acceptability and Consumption, Mood and Stress on Long-Term Space Missions (Astro Palate) studies the relationship among emotions, mood, stress and eating during spaceflight. The study explores ways to minimize stressful aspects of the eating situation so that individuals consume more food and are more satisfied with it. Additionally, the experiment examines ways to use the eating itself to reduce the stress or negative moods that crewmembers might normally experience in flight.

Today’s Planned Activities
All activities have been completed unless otherwise noted.

  • HRF Saliva Sample Collection & MELFI Insertion
  • PBA – Relocation for upcoming EVA
  • Closing USOS Window Shutters
  • CUCU Deactivation
  • Photo Camera Test
  • Atmosphere Control and Supply (ACS) High Pressure Oxygen Bypass Configuration
  • USOS EVA Preparation
  • Weekly Housekeeping
  • БМП (Micropurification Unit) Fan Grille Cleaning
  • Cleaning Auxiliary Computer System (ВКС) Laptops
  • Comm configuration for USOS EVA Prep Ops
  • SM Ventilation Subsystem Preventive Maintenance, Group E
  • FGB ЦВ2 Fan Cleaning
  • Inspection of Air Conditioner
  • Cleaning Auxiliary Computer System (ВКС) Laptops
  • Bringing Atmosphere Control and Supply (ACS) to Nominal Configuration
  • EMU Prep for EVA
  • Cleaning Auxiliary Computer System (ВКС) Laptops
  • Prebreathe in EMU
  • CASKAD. Manual Mixing in Bioreactor
  • Crew Lock Depress
  • BIOPLENKA (BIOFILM). Removal from the Thermostat, Fixation of Constanta Cassette No.3-4 Biofilm
  • Crew Lock Depress Ops
  • Crew Lock Egress
  • Safing J850 Connector
  • USOS EVA Ops
  • PMA2 Port Umbilical Re-Route
  • Install IDA Cables Under Port Shield
  • J850 Connector Remate
  • Install IDA Cables Under Starboard Shield
  • IDA Cable Deployment
  • Crew Lock Ingress
  • Start BSA Battery Charge
  • EVA Glove Photo Setup
  • Crew Lock Repress
  • Post-EVA Activities
  • CASKAD. Manual Mixing in Bioreactor
  • Return to nominal comm config after USOS EVA Prep Ops
  • US Post-EVA Photo Camera Reconfig
  • EVA Glove Photo Downlink
  • Start BSA Battery Charge

Completed Task List Items

  • None

Ground Activities
All activities have been completed unless otherwise noted.

  • Nominal Commanding
  • System commanding in support of EVA 29

Three-Day Look Ahead:

  • Sunday, 02/22: EVA Debrief, EVA Tool Configuration, EVA Battery Charging, Crew Day Off
  • Monday, 02/23: Drain Brain PFS/Ultrasound, Aniso, Microbes,EMU Dry Out, EVA Procedure Review
  • Tuesday, 02/24: EVA Preps, EVA Tool Config, PWD Filter R&R, EVA DOUG and Procedure Reviews and Conference

QUICK ISS Status – Environmental Control Group:

Component

Status

Elektron

On

Vozdukh

On

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

On

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

Off

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Idle

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Standby

Urine Processing Assembly (UPA)

Stop

Trace Contaminant Control System (TCCS) Lab

Off

Trace Contaminant Control System (TCCS) Node 3

Full up