ISS On-Orbit Status Report

ISS Daily Summary Report – 01/27/15

Loss of Port Thermal Radiator (PTR) Multiplexer/Demultiplexer (MDM): This morning, there was a loss of the PTR MDM. This MDM controls and provides insight to the Radiator Beam Valve Module (RBVM) system on External Thermal Control System (ETCS) Loop B. This afternoon, flight controllers downlinked and analyzed supplementary telemetry then reinitialized the MDM without issue. Preliminary investigation results point towards a radiation-induced transient failure.

NanoRacks Module 9: Wilmore activated/agitated/deactivated the mixture tubes to facilitate NanoRacks Module-9 operation C experiments. Module-9 is a collection of student research projects utilizing the NanoRacks Mixsticks. The NanoRacks-National Center for Earth and Space Science Education investigation results from a commercial Science Technology, Engineering and Math (STEM) education program overseen by the National Center for Earth and Space Science Education (NCESSE), called the Student Spaceflight Experiments Program (SSEP). Student teams from across the United States design their own experiments using flight approved fluids and materials. The investigation consists of 19 different science experiments flown in a NanoRacks Module on board the ISS.

Advanced Plant Experiment (APEX) 03-1: Wilmore inserted nine APEX fixation tube kits into the Minus Eighty Degree Laboratory Freezer for ISS (MELFI) and removed sample kit 4. APEX-03-1 continues a highly successful investigation into the effects of microgravity on the development of roots and cells on plant seedlings. The experiment photographs seedlings of Arabidopsis, or thale cress, every two hours as they grow in petri dishes. After 14 days, the seedlings are preserved for return to Earth and detailed analysis

Coarsening in Solid Liquid Mixtures (CSLM)-4: After consultation with the ground team, Virts interrupted processing the fifth CSLM-4 sample and removed the sample processing unit (SPU). The SPU was stowed and is available for re-processing at a later time. This action was taken when an LED indicated an improper MODE for continuing successfully. The equipment was power cycled, appropriate trouble shooting performed and the sixth CSLM-4 sample inserted and prepared to be conditioned for processing starting Thursday. CSLM-4 is a materials science investigation that studies the growth and solidification processes (i.e., coarsening) in lead-tin solid-liquid mixtures that contain a small amount (low volume fraction) of tin branch-like (i.e., dendritic) structures, some of which possess many arms. During sample heating, the growth at the tip of each dendrite continues over time, whereas side branches, behind the tip, develop during constant temperature (i.e., isothermal) conditions. By understanding how temperature and time control the growth of such dendrites, researchers hope to develop more efficient and economical means of producing higher quality products derived from the casting of molten metals

NanoRacks Module-48: Cristoforetti took photos and videos of the contents of Module-48; a set of printed materials, seeds, and USB flash drives to be documented in orbit. The purpose of the experiment is to raise awareness of the potentials of spaceflight and encourage student interest in the sciences.

SpaceX-5 Dragon Cargo Loading: All three USOS Crewmembers continued loading cargo into Dragon today. SpaceX-5 unberth is scheduled to occur on 10 February 2015, with splash down occurring later the same day.

Extravehicular Activity (EVA) Preparation: Wilmore operated fans on both Extravehicular Mobility Units (EMU) 3003 and 3005. He then removed EMU 3005 from the forward EMU Don/Doff Assemblies (EDDA) and install EMU 3011 for troubleshooting. Once EMU 3011 was installed onto the EDDA, Wilmore setup for high speed data and performed a dump and fill of the EMU water tanks prior to conducting a flush on the suit. Lastly, he terminated then initiated another Long Life Battery (LLB) charge cycle. This work is being conducted in preparation for upcoming EVAs next month.

Columbus Internal Thermal Control System (ITCS) Maintenance: Virts Installed an ITCS maintenance canister at the COL1O2 Utility Interface Panel (UIP) to introduce antimicrobial agent Ortho-Phthalaldehyde (OPA) to the COL ITCS. The canister is run in the system for a minimum of 4 hours to introduce the OPA into the loop and then the canister remains in the system for at least 24 hours for thermal equalization prior to removing the canister from the loop. This maintenance is done periodically to maintain the quality of the water in the ITCS loops.

Today’s Planned Activities
All activities are completed unless otherwise noted.

  • DRAGON Transfer Ops
  • APEX3 – Sample Insertion into MELFI
  • Regeneration of БМП Ф2 Micropurification Cartridge (start)
  • APEX3 – Sample Removal from MERLIN
  • Filling (separation) of EDV (KOV) for Elektron or EDV-SV
  • EKAM Battery Swap / See OSTPV for Procedure
  • BCAT – Battery Charge
  • Monitoring Performance of КОБ, КОХ Loops / r/g 7806
  • VIRTUAL. Experiment Ops Tagup with specialists (as necessary)
  • Gathering equipment required for ITCS Preventive Maintenance in Columbus
  • CARDIOVECTOR. Experiment Ops Tagup with specialists
  • EMU-3011 – Flushing
  • ТКГ 424 (DC1) Transfers and IMS Ops
  • ITCS Maintenance Canister Installation in Columbus
  • Dumping and filling EMU Water Tanks prior to EMU 3011 Flush
  • VIZIR. Experiment Ops. Tagup with specialists. Note 4
  • Microbial Air Sampling (medium 2), medium 2 analysis, locations No.1-8. Note 4
  • EMU backpack replacement
  • EVA – Fan run in Airlock
  • EKAM – Battery Swap / See OSTPV for Procedure
  • URAGAN. Observation and photography using Photo Equipment
  • PROBOY. RSE1 Laptop Software Update for PROBOY Experiment
  • SM CO measurement using CMS unit
  • PROBOY. Connecting Auto Recorder [АР]. Tagup with specialists
  • WRS Water Sample Analysis
  • BCAT – Battery Replacement and Photo Downlink
  • PROBOY. RSЕ1 Station Laptop Activity
  • PROBOY. Penetration Simulator Ops
  • NANO Mod 9 – Activation and Shaking the Tubes
  • PROBOY. Copy and Downlink Data / r/g 7809
  • СКПФ1, СКПФ2 Dust Filter Replacement and MRM1 Gas-Liquid Heat Exchanger (ГЖТ) Cleaning
  • Monitoring КОБ1 Loop Health
  • CSLM2 – Sample Processing
  • ТКГ 422 (DC1) Stowage and IMS Ops
  • NANO Module 48- Photo/Video Ops
  • EMU LIB battery Charge (end)
  • Start EMU Battery Charge
  • EKAM – Battery Swap / See OSTPV for Procedure
  • Dragon – Cargo Tagup
  • TOCA Data Recording
  • Dragon Cargo Operations Conference
  • БМП Ф2 Absorption Cartridge Regeneration (termination)

Completed Task List Items

  • Dragon Cargo Ops [In work]

Ground Activities
All activities are completed unless otherwise noted.

  • Nominal Commanding
  • UHF activation/deactivation in support of EMU activities

Three-Day Look Ahead:

  • Wednesday, 01/28: Cargo Ops, Robonaut, Fruit Flies, and Cognition. ATV deboost
  • Thursday, 01/29: Cargo Ops, EVA Tool Cnfg, CSLM, J-SSOD install on JEMAL
  • Friday, 01/30: APEX harvest 3, EpiGenetics

QUICK ISS Status – Environmental Control Group:

Component

Status

Elektron

On

Vozdukh

On

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

On

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

Off

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Idle

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Process

Urine Processing Assembly (UPA)

Standby

Trace Contaminant Control System (TCCS) Lab

Off

Trace Contaminant Control System (TCCS) Node 3

Full up