Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from 2014

View All Posts

    ISS Daily Summary Report – 12/02/14

    EXPRESS Rack (ER) Gateway Configuration:  Virts configured the ER6, 7, 8 laptops to communicate with the Payload Ethernet Hub/Gateway (PEHG)-2 allowing remote desktop access from the ground to the laptops via the ISS Ku-Band link. 3D Printing in Zero G:  Cristoforetti removed and stowed a 3D printed coupon that was created yesterday. Afterwards, ground teams …

    Read Full Post

    ISS Daily Summary Report – 12/01/14

    Cyclops Install onto JEM Airlock (JEMAL):  Following Friday’s successful deployment of SpinSat, Wilmore and ground teams returned the Cyclops launch platform to the JEMAL. The JEMAL outer hatch was opened, the slide table extended and the JEM Remote Manipulator System (JEMRMS) Small Fine Arm (SFA) guided the Cyclops for installation onto the slide table.  The …

    Read Full Post

    ISS Daily Summary Report – 11/28/14

    Special Purpose Inexpensive Satellite (SpinSat):  Wilmore and ground operations teams deployed the SpinSat today.   The Japanese Experiment Module Airlock (JEMAL) was depressed, the outer hatch opened and the slide table extended.  The JEM Remote Manipulator System (JEMRMS) small fine Arm (SFA) guided to grapple the Cyclops launch platform and maneuvered into position for the SpinSat …

    Read Full Post

    ISS Daily Summary Report – 11/26/14

    Advanced Resistive Exercise Device (ARED) Cable Fraying Status:  Based on the ground team’s review of the ARED Right Upper Stop Cable, they requested that the crew confirm no issues with un-racking and racking the Main Arm in the current configuration.  Wilmore tested and confirmed there were no issues with the Main Arm movement.  The crew …

    Read Full Post

    ISS Daily Summary Report – 11/25/14

    Advanced Resistive Exercise Device (ARED) Cable Fraying: Yesterday, the crew reported fraying of the ARED Left Upper Stop Cable which was confirmed by ground team review of downlinked photos.  Today, the crew disengaged the Left Upper Stop Cable to prevent cable failure and inspected and straightened the Right Upper Stop Cable.  Ground teams are currently …

    Read Full Post

    ISS Daily Summary Report – 11/23/14

    41 Soyuz (41S) Launch and Dock:  41S launched from the Baikonur Cosmodrome at 3:01pm CST today with Shkaplerov, Cristoforetti, and Virts onboard. After orbital insertion, the vehicle deployed its antennas and solar arrays nominally then proceeded with a 4-orbit rendezvous with ISS.  Docking to the MRM-1 module occurred at 8:49 PM CST with hatch opening …

    Read Full Post

    ISS Daily Summary Report – 11/21/14

    Seedling Growth-2: The third of three six-day-growth sessions was completed today. Wilmore removed Experiment Containers (ECs) from the European Modular Cultivation System (EMCS), processed the samples and stowed them in the Minus Eighty degree Laboratory Freezer for ISS (MELFI) for return on a later flight.  In a troubleshooting effort, the crew installed the single EC …

    Read Full Post

    ISS Daily Summary Report – 11/20/14

    Fluids Integration Rack (FIR) maintenance:  Wilmore replaced both the LMM (Light Microscopy Module) Microscope Power/Data Cable 1 and the LMM Monochrome Camera 1 and configured LMM for microscope characterization. The configuration includes removing the current Advanced Colloids Experiment (ACE) sample, replacing one objective lens, and installing Preliminary Advanced Colloids Experiment (PACE) Target inside Auxiliary Fluids …

    Read Full Post

    ISS Daily Summary Report – 11/19/14

    Khladon (Freon 218) Venting:  Samokutyaev and Serova performed steps to release pressure in the Russian Segment Air Conditioner System [СКВ] by venting Khladon (Freon 218) overboard.  However, several of the quick disconnects that were actuated during the procedure exhibited leaks. As a result, the Khladon was vented into the cabin instead.  The quantity released was …

    Read Full Post

    ISS Daily Summary Report – 11/18/14

    Multi-user Droplet Combustion Apparatus (MDCA):  Wilmore reviewed procedures and gathered hardware and tools for MDCA Hardware Replacement Part 1.  Today’s activity had the crew configure the Fluid Combustion Facility (FCF) MDCA Chamber Insert Assembly (CIA) in support of the Flame Extinguishment Experiment-2 (FLEX-2) Binary-Droplet Array test points.  Crew then removed the MDCA CIA from the …

    Read Full Post