Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

ISS Daily Summary Report – 05/27/14

Resist Tubule Clean Up: Commander (CDR) Swanson removed the Measurement Experiment Unit B from inside the Cell Biology Experiment Facility (CBEF) 1-gravity Incubator Unit (IU) and configured the Clean Bench (CB) to a standby mode. More Resist Tubule samples will be processed at a later date. Resist Tubule clarifies the mechanisms of gravity resistance. Gravity resistance is a principal gravity response in plants, and plays an important role in the transition of plant ancestors from an aquatic environment to a terrestrial environment (about 450 million years ago), and in the consequent establishment of land plants. This present study clarifies the mechanisms of gravity resistance, in particular the processes from signal transformation and transduction, to response.

Earth Rim Observation Preparation: Swanson set up cameras in the Cupola to take sequential pictures of the Earth’s rim. The images from the Cupola will be taken in conjunction with the nadir-pointing Visible and Infrared Spectral Imager (VISI) on the external Multi-mission Consolidated Equipment (MCE). This will give the ground stereoscopic images to help clarify the structures and dynamics of the Earth’s upper atmosphere using the emission of the airglow and the aurora.

Camera Light Pan Tilt Assembly (CLPA) Remove & Replace (R&R): Today Robotics Ground Controllers completed CLPA R&R operations that started last Friday. They used the Space Station Remote Manipulator System (SSRMS) and Special Purpose Dexterous Manipulator (SPDM) to remove the new CLPA from the JEM slidetable and install it on the SSRMS Boom. Ground controllers then completed a checkout of the CLPA. Pan, tilt, and zoom were all fully functional, but the iris would not fully close. The camera is usable despite this issue. Additional troubleshooting will be planned at a later date.

Portable Fire Extinguishers (PFEs), Portable Breathing Apparatus (PBAs), and Extension Hose Tee Kits (EHTKs) Inspection: Swanson completed this routine maintenance today, verifying that PBAs, PFEs and EHTKs are free of damage and ensuring functionality.

Advanced Resistive Exercise Device (ARED) Status: Following an ARED dashpot inspection, Swanson downlinked photos for review. Ground teams discovered that 2 of the 4 x-axis dashpots are broken. The crew has been instructed to stand down on ARED use until an R&R can be completed later this week.

Today’s Planned Tasks

  • Laptop RSS1, RSS2 reboot / r/g 1009 [Complete]
  • SM Caution and Warning Panel (ПСС) test [Complete]
  • Laptop RS1(2) reboot / БВС, [Complete]
  • On MCC GO БМП Ф2 absorption cartridge regen (start) [Complete]
  • JPM Window Shutter Close [Complete]
  • Daily Planning Conference (S-band) [Complete]
  • Acoustic Dosimeter Operations [Complete]
  • Check results of virus scanning on ВКС laptops / r/g 5705, 5704 [Complete]
  • Voice Check with Baikonur on S/G1 [Complete]
  • VEG-Daily Plant Check [Complete]
  • VEG- Plant Pillow Watering. PL VEG-01 at previously planned time. [Complete]
  • VIRU. Check log files generation post RSK2 shell replacement. r/g 5716 [Complete]
  • BAR. Experiment Ops. Tagup with specialists. / r/g 5718 [Complete]
  • Т2 System Monthly Inspection [Complete]
  • RST – Sample Removal [Complete]
  • SOZh Maintenance [Complete]
  • JEM Airlock Slide Table extension to JEF side, part 1 [Complete]
  • Lower Extremity Veins Examination r/g 5717 [Complete]
  • Resist Tubule Experiment. Deploy Box (clean work place) СB [Complete]
  • WRM – condensate transfer – start [Complete]
  • Soyuz 712 (MRM2) Quick-disconnect Screw Clamps Tightening [Complete]
  • JEM Airlock – JEM ORU XFER I/F Release [Complete]
  • Fit Check in Kazbek couch (Soyuz 712) [Complete]
  • WRM – condensate transfer – end [Complete]
  • Resist Tubule Experiment. Prepare to complete operations with CB [Complete]
  • Lower Extremity Veins Examination r/g 5717 [Complete]
  • NAPOR-mini RSA. Install ТВМ1-Н (0304) software to support Optical Telescope System r/g 5723 [Complete]
  • Inspection of PBAs and PFEs [Complete]
  • NAPOR-mini RSA. ДПН Update.r/g 5722 [Complete]
  • PAO Setup [Complete]
  • IMS Ops/ СУИ, [Complete]
  • MERLIN dehumidifier: set replacement [Complete]
  • JEM Airlock Slide Table Retraction from JEF side, part 1 [Complete]
  • PAO Setup [Complete]
  • Preparation for PAO [Complete]
  • PAO Event [Complete]
  • EARTH – Earth Observation Preparation [Complete]
  • Daily Planning Conference (S-band) [Complete]
  • On MCC GO БМП Ф2 absorption cartridge regen (termination)

Task List

  • ARED Cylinder Evac
  • WHC KTO replace
  • WHC EDV-U R&R
  • Roscosmos Report
  • Ekon Photo
  • Locating TVS КЛ
  • 3DA1-Cam-Ops
  • ARED Dashpot inspect [Complete]
  • CEVIS Isolator MOD
  • Cygnus pre-gather
  • EMU 3005 Photos [Complete]
  • EMU LLB Auto-Init
  • EMU LLB SSC Relocate
  • EMU LLB SSC Return
  • EVA ORU Bag Inspection
  • IFM MOOT restow
  • NOD2O2 Cleanout
  • No-skid tape audit
  • NOD3 PEPS assessment
  • P/TV Hardware questions
  • POSSUM PL Photo
  • PMM cleanup
  • WRS MRF Remove

Ground

  • Nominal commanding [Complete]
  • SSRMS and SPDM operations for CLPA install on the SSRMS boom [Complete]

Three-Day Look Ahead:

  • Wednesday, 05/28: Sprint Ultrasound, SLM operations, 39S Launch and Dock
  • Thursday, 05/29: Safety Briefing, CQ outfitting
  • Friday, 05/30: Crew Handover, JOTI remove, IMV Flow measurement, Cygnus Rendezvous CBT

QUICK ISS Status – Environmental Control Group:

Component Status
Elektron On
Vozdukh Manual
[СКВ] 1 – SM Air Conditioner System (“SKV1”) Off
[СКВ] 2 – SM Air Conditioner System (“SKV2”) Off
Carbon Dioxide Removal Assembly (CDRA) Lab Override
Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate
Major Constituent Analyzer (MCA) Lab Stop
Major Constituent Analyzer (MCA) Node 3 Operate
Oxygen Generation Assembly (OGA) Process
Urine Processing Assembly (UPA) Standby
Trace Contaminant Control System (TCCS) Lab Off
Trace Contaminant Control System (TCCS) Node 3 Full up