Payloads Airborne Particulate Monitor (APM) Install: The crew inspected the APM unit for debris, installed it in its Node 3 location, then powered it up and took photos. Air quality in crewed spacecraft is important for keeping astronauts healthy and comfortable. Although requirements exist for maximum allowable concentrations of particulate matter, currently no measurement capability …
NASA Prepares for Next Series of RS-25 Engine Tests for SLS Rocket

NASA installed a developmental RS-25 engine into the test stand at Stennis Space Center near Bay St. Louis, Mississippi. This engine will be used in an upcoming test series to gather data and evaluate new components for development and production of new RS-25 engines for future Artemis missions. The new RS-25s, built by Aerojet Rocketdyne, …
Sentinel-6 Michael Freilich ‘Go’ For Launch, Prelaunch News Conference at 2 p.m. PST (5 p.m. EST)

Launch and mission managers have completed the Launch Readiness Review for the Sentinel-6 Michael Freilich mission. At the conclusion of the review, NASA’s Launch Services Program, SpaceX, the European Space Agency (ESA), and NOAA agreed to target the launch for 9:17 PST (12:17 p.m. EST) on Saturday, Nov. 21, from Space Launch Complex 4 at …
Expanded Crew Syncs Schedule and Steps Up Space Research

The seven-member Expedition 64 crew has synched up its schedule following a busy week that saw the arrival of the SpaceX Crew-1 mission and a Russian spacewalk. The International Space Station’s four newest crew members are fitting in a variety of space research today. The quartet also continues to get up to speed with station …
Sentinel-6 Michael Freilich Launch Readiness Review, Televised Briefings on Tap Today

Today, launch and mission managers are holding the final major review, called the Launch Readiness Review, for the Sentinel-6 Michael Freilich mission that will launch from Space Launch Complex 4 at Vandenberg Air Force Base in California. Launch is targeted for 9:17 a.m. PST (12:17 p.m. EST) on Saturday, Nov. 21. Coming up today at …
ISS Daily Summary Report – 11/19/2020
Payloads Avatar-X: In support of the Avatar-X experiment, the crew set up the video camera, opened the JEM aft window shutter, and removed the camera lens caps. JEM Commercial (Avatar-X, or Kibo Avatar-X) demonstrates remote robot technology, Avatar-X, a 4K Camera, and new encoding method developed by ANA HOLDINGS INC. (All Nippon Airways). A user …
20 Years of Observing Earth from the International Space Station
After 20 years of continuous human presence, the International Space Station (ISS) has provided 241 visitors with an extraordinary view of Earth from outer space — one they have shared with the rest of the world. Astronaut photography, formally called Crew Earth Observations (CEO), has resulted in more than 3.5 million photographs of the ever-changing […]
Space Science Ramps Up as Spacewalkers Sleep In

Three Expedition 64 crewmates slept in today following Wednesday’s spacewalk to upgrade the International Space Station for a new Russian module. Meanwhile, the station’s four newest crew members are adjusting to life in space, working science and unloading cargo from the SpaceX Crew Dragon vehicle. NASA astronaut Kate Rubins had a long day Wednesday as …
Cosmonauts Wrap Up Spacewalk at Station

Expedition 64 Commander Sergey Ryzhikov and Flight Engineer Sergey Kud-Sverchkov of the Russian space agency Roscosmos have completed a spacewalk lasting 6 hours and 48 minutes. The two cosmonauts opened the hatch to the Poisk module‘s airlock to begin the spacewalk at 10:12 a.m. EST. They re-entered the airlock and closed the hatch at 5 p.m. EST. During the spacewalk, the duo inspected the Poisk airlock for leaks, relocated an …
ISS Daily Summary Report – 11/18/2020
Russian Segment (RS) Extravehicular Activity (EVA) #47: Today, CDR Sergey Ryzhikov (EV1) and FE-5 Sergey Kud-Sverchkov (EV2) egressed the Mini-Research Module (MRM)-2 airlock and completed the following tasks during today’s 6 hour and 48 minute EVA: Leak check of MRM-2 Extravehicular (EV) hatch Disconnect TRANZIT-B antenna feeder from Service Module (SM) – Docking Compartment (DC)-1 …


