Due to the lapse in federal government funding, NASA is not updating this website.

Suggested Searches

Missions

Categories

Also Featured In

Launch Managers Give “Go” to Proceed with Terminal Count, Launch Set for 1:47 a.m.

The mission management team has polled “go” to proceed with the terminal count sequence. The launch director is also “go” and teams have set a new target launch time of 1:47 a.m. EST and the countdown clock resumed at 1:37 a.m.

With approval from the launch director and managers, a series of countdown milestones for the Artemis I terminal count to launch will be initiated by the Ground Launch Sequencer at T-10 minutes:

  • Ground Launch Sequencer (GLS) initiates terminal count (T-10M)
  • GLS go for core stage tank pressurization (T-6M)
  • Orion ascent pyros are armed (T-6M)
  • Orion set to internal power (T-6M)
  • Core Stage LH2 terminate replenish (T-5M57S)
  • GLS is go for flight termination system (FTS) arm (T-5M)
  • GLS is go for LH2 high flow bleed check (T-4M40S)
  • GLS is go for core stage auxiliary power unit (APU) start (T-4M)
  • Core Stage auxiliary power unit starts (T-4M)
  • Core stage L0X terminate replenish (T-4M)
  • ICPS LOX terminate replenish (T-3M30S)
  • GLS is go for purge sequence 4 (T-3M10S)
  • ICPS switches to internal battery power (T-1M56S)
  • Core stage switches to internal power (T-1M30S)
  • ICPS enters terminal countdown mode (T-1M20S)
  • ICPS LH2 terminate replenish (T-50S)
  • GLS sends “Go for automated launch sequencer” command (T-33S)
  • Core stage flight computer to automated launching sequencer (T-30S)
  • Hydrogen burn off igniters initiated (T-12S)
  • GLS sends the command for core stage engine start (T-10S)
  • RS-25 engines startup (T-6.36S)

Liftoff (T-0)

  • Solid rocket booster separation (Mission Elapsed Time 00:02:12)
  • Service module fairing jettison (MET 00:03:11)
  • Launch abort system jettison (MET 00:03:16)
  • Core stage main engine cutoff commanded (MET 00:08:03)
  • Core stage/ICPS separation (MET 00:08:15)
  • Orion solar array wing deploy begins (MET 00:18:09) – approx. 12 min duration
  • Perigee raise maneuver (MET 00:52:56)
  • Trans-lunar injection (MET 01:29:27)
  • Orion/ICPS separation (MET 01:57:36)

The timing of events after liftoff may vary by a few seconds.

Categories