
Propellant Tank Installation at the B-3 Test Stand
Installation of a propellant run tank during construction of the B-3 stand. The 65-ton crane was used to install equipment and test articles (8/6/1963).
Image Credit: NASA
- X
https://www.nasa.gov/image-detail/grc-1964-p-01684/
Image CreditNASA
Size2080x2685px