Suggested Searches

1 min read

Rollout from Above

Carried by its mobile launcher platform, shuttle Discovery slowly moves through the high bay doors of the Vehicle Assembly Building on the way to Launch Pad 39A before the STS-82 mission.
Carried by its mobile launcher platform, shuttle Discovery slowly moves through the high bay doors of the Vehicle Assembly Building on the way to Launch Pad 39A before the STS-82 mission. A seven-member crew performed the second servicing of the orbiting Hubble Space Telescope during the flight.

Carried by its mobile launcher platform, shuttle Discovery slowly moves through the high bay doors of the Vehicle Assembly Building on the way to Launch Pad 39A before the STS-82 mission. A seven-member crew performed the second servicing of the orbiting Hubble Space Telescope during the flight.
Image credit: NASA
Jan. 17, 1997