Suggested Searches

Throat section of tunnel with paint removed

Altitude Wind Tunnel (AWT) Demolition: Abatement Phase

The Altitude Wind Tunnel (AWT) demolition began in the fall of 2008 with lead paint and asbestos remediation.

Image Credit: NASA
Download