
Altitude Wind Tunnel (AWT) Demolition: Abatement Phase
The Altitude Wind Tunnel (AWT) demolition began in the fall of 2008 with lead paint and asbestos remediation.
Image Credit: NASA
- X
https://www.nasa.gov/image-detail/grc-2008-c-04589/
Image CreditNASA
Size2670x1975px