
J-57 ENGINE IN THE ALTITUDE WIND TUNNEL AWT EQUIPPED WITH DOUGLAS STANDARD NOZZLE AND FAIRING
A P&W J57 engine was tested with a Douglas standard nozzle and faring for a noise reduction study conducted in the Altitude Wind Tunnel (AWT) (4/10/1957).
Image Credit: NASA/PAUL RIEDEL
- X
https://www.nasa.gov/image-detail/grc-1957-c-44737/
Image CreditNASA/PAUL RIEDEL
Size2664x2184px