
STS-33 Discovery, OV-103, in KSC Vehicle Assembly Bldg after ET/SRB mating
S89-49412 (25 Oct 1989) --- Preparations are underway to rollout the Space Shuttle orbiter Discovery from the Vehicle Assembly Building (VAB) to Pad 39B, as KSC employees work toward the mid-November launch of STS-33, a Department of Defense Devoted mission. Poor weather has thus far hampered attempts to roll out the Discovery and the next attempt is scheduled for midnight tomorrow.
- X
https://www.nasa.gov/image-detail/amf-s89-49412/
TakenOctober 25, 1989
ProducerJSC
Size1512x1920px
PIA Numbers89-49412