
Updates in Orion High Bay – March 2019
The crew and service module for Artemis I continue preparations for mating inside the Operations and Checkout (O&C) Building High Bay at Kennedy Space Center on March 21, 2019. Alongside, the pressure vessel for Artemis II is undergoing install of its secondary structure.
Image Credit: NASA/Ben Smegelsky
- X
https://www.nasa.gov/image-detail/amf-jsc2022e045731/
TakenMarch 21, 2019
ProducerJSC
Image CreditNASA/Ben Smegelsky
Size1920x1280px
PIA Numberjsc2022e045731