Construction crews work on the A-2 Test Stand foundation
Construction crews install steel reinforcing rods at the base of what became the A-2 test stand. The excavation for the stand went down 50 feet with steel H-beams driven 100 feet deeper to form a foundation for the huge piers of the test stand.