Suggested Searches

1 min read

Pedestal Wall Forming at DSS-56 Construction Site

DSS-56, Cement Pedestal
The pedestal circumferential wall is forming at the DSS-56 construction site. Cement is poured in stages inside the circumferential wall. First, cement is poured one-half the height of the wall; second, cement is poured for the second half of the wall, for a total height of about 27 feet.

Deep Space Station-56 (DSS-56): The pedestal circumferential wall is forming at the DSS-56 construction site. Cement is poured in stages inside the circumferential wall. First, cement is poured one-half the height of the wall; second, cement is poured for the second half of the wall, for a total height of about 27 feet.