
Workers at Cape Kennedy watch a 224-foot-high Saturn 1B rocket lift off from Launch Complex 34 carrying Apollo 7 astronauts…

Apollo astronauts, left to right, Gus Grissom, Ed White, and Roger Chaffee, pose in front of Launch Complex 34, which…

Facing southwest, this aerial view depicts early construction of Launch Pad 39A, one of two launch sites built for the…

Saturn blockhouse personnel at Launch Complex 37 during the liftoff of SA-3 include Center Director Kurt Debus and Wernher von…

Kurt Debus, the center's first director who served from 1961 to 1974, adds his name to the thousands of signatures…

In this aerial photo, Launch Pad 39A is seen under construction in 1964.

The Vehicle Assembly Building is under construction in this aerial view.

NASA Administrator James T. Webb holds the microphone as President Lyndon B. Johnson and astronaut Walter Schirra converse during the…

On Dec. 26, 1963, ownership of the facility officially was transferred from the U.S. Air Force to NASA. Now called…

For the Gemini program, a few changes were made to the Mission Control Flight Control Area layout. One change was…