Suggested Searches

1 min read

Northrop Grumman E-2C Hawkeye

Northrop Grumman E-2C Hawkeye
echnicians at NASA Dryden's Flight Loads Lab install a fixture inside an engine nacelle in preparation for major structural loads tests on an E-2C Hawkeye.

EC04-0360-50
Technicians at NASA Dryden’s Flight Loads Lab install a fixture inside an engine nacelle in preparation for major structural loads tests on an E-2C Hawkeye.December 15, 2004NASA Photo / Tony Landis› F-2C Project Description