ISS Daily Summary Report – 7/17/2020
Payloads
Food Physiology: The crew performed the Food Physiology briefing. The Integrated Impact of Diet on Human Immune Response, the Gut Microbiota, and Nutritional Status During Adaptation to Spaceflight (Food Physiology) experiment is designed to characterize the key effects of an enhanced spaceflight diet on immune function, the gut microbiome, and nutritional status indicators. These factors are interlinked, but diet is the only one that can be easily and meaningfully altered on Earth or during flight. This investigation aims to document the effect of dietary improvements on human physiology and the ability of those improvements to enhance adaptation to spaceflight.
Systems
Extravehicular Activity (EVA) Preparations: Today, the crew performed EVA activities as a continuation of yesterday’s EVA and the upcoming EVA on Tuesday, July 21st. They configured the BSA batteries for charging, performed a water recharge on the Extravehicular Mobility Units (EMUs) and initiated EMU Metal Oxide cartridge regeneration. The crew also took additional photos of the EVA gloves per Engineering request. Finally, the crew completed their EVA procedure reviews and participated in an EVA procedure review conference.
Post- EVA Periodic Health Exam (PHS): Today the crew completed a health evaluation. During the evaluation, vital signs are obtained and an ear examination is conducted by taking images of the tympanic membranes and the external ear. The data and imagery is then downlinked for review by a medical specialist. PHS exams are conducted within 24 hours of the conclusion of EVA.
Urine Processing Assembly (UPA) Brine Filter: As part of regular maintenance, the ISS crew opened up the UPA Fill Drain Valve Enclosure and removed the installed/old Brine Filter and replaced it with a new Brine Filter. Brine Filters are replaced every 60 days.
Completed Task List Activities:
- None
Today’s Ground Activities:
All activities are complete unless otherwise noted.
- UPA recycle tank fills via UTS
- Channel 3B Activation
- Node 3 CDRA activation for supplemental METOX scrubbing
- KCU 1 Troubleshooting
Look Ahead Plan
Saturday, 7/18 (GMT 200)
Payloads:
- Off Duty Day
Systems:
- USOS Shutter Close
- EVA Camera Port 3 Bag Prep
- EVA METOX Ops
Sunday, 7/19 (GMT 201)
Payloads:
- No Payload Activities
Systems:
- EVA Procedure Review/Conference
- RELL RITS Install
- EVA Tool Config
- EVA Cuff C/L Print
- (EVA) Kapton Tape Scraper (KaTS) Build
Monday, 7/20 (GMT 202)
Payloads:
- No Payload activities
Systems:
- Pre-EVA PHS Exams
- EVA Tool Config & Audit
- EVA Procedure Review/Conference
- EVA Equip Lock Prep Pt 2
Today’s Planned Activities:
All activities are complete unless otherwise noted.
- ISS HAM Radio Power Up
- ISS crew and ГОГУ (RSA Flight Control Management Team) weekly conference (S-band)
- Regeneration of Micropurification unit (БМП) Ф2 cartridge, end
- Progress 448 (SM Aft) Transfers and IMS Ops
- CARDIOVECTOR. Experiment Session
- Verifying electrical connection of ИДЭ-4 No.2 smoke detector with DC1 Fire Detection System (СПО)
- Food Physiology Crew Diet Briefing
- Health Maintenance System (HMS) Periodic Health Status (PHS) Post EVA Examination
- ALGOMETRIYA. Experiment Session
- Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain, Fill and Process
- Changeout of ПФ1 & ПФ2 Dust Filters and Cleaning В1, В2 Fan Screens in DC1
- Health Maintenance System (HMS) ISS Food Intake Tracker (ISS FIT)
- Portable Computer System (PCS) Serial Transfer – OFF
- Rechargeable EVA Battery Assembly (REBA) Removal
- Post EVA 67 Additional EMU Glove Photos
- Changeout of ПФ1 & ПФ2 Dust Filters and Cleaning В1, B2 Fan Screens in MRM2
- Rechargeable EVA Battery Assembly (REBA) Installation
- Battery Stowage Assembly (BSA) Operation Initiation
- VIP Conference – JEM
- Regenerative Environmental Control and Life Support System (ECLSS) Urine Processor Assembly (UPA) Brine Filter Gather and Changeout
- Extravehicular Activity (EVA) Procedure Review
- IDENTIFIKATSIYA. Copy ИМУ-Ц micro-accelerometer data to laptop
- Vacuum cleaning of air ducts ВД1 and ВД2 in MRM2
- Reading Pille dosimeter data post USOS EVA
- MATRYOSHKA-R. Tritel Hardware Monitoring
- PILOT-T. Experiment Ops
- EMU Data Recorder Power On
- Extravehicular Activity (EVA) Debrief for US EVA
- Extravehicular Mobility Unit (EMU) Water Recharge
- Urine Transfer System Offload EDV Swap
- ABOUT GAGARIN FROM SPACE. HAM radio session with Ufa International Aerospace School students
- Metal Oxide (METOX) Regeneration Initiation