Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from March 2018

View All Posts

    ISS Daily Summary Report – 3/05/2018

    Combustion Integrated Rack (CIR) Advanced Combustion via Microgravity Experiments (ACME) Electric-Field Effects on Laminar Diffusion (E-Field) Flames:  The crew replaced the compensator module in the CIR Hi Bit-depth Multi-Spectral (HiBMS) Imaging package today.  This is in preparation for the upcoming ACME E-Field Flames investigation. The ACME investigation is a set of five independent studies of …

    Read Full Post

    ISS Daily Summary Report – 3/02/2018

    Node 3 Major Constituent Analyzer (MCA) Calibration Failure: Yesterday, the crew successfully replaced the N3 MCA Verification Gas Assembly (VGA) as part of regularly scheduled maintenance. During calibration, however, data was off-nominal and the planned full calibration failed to complete.  Teams continue to work a forward plan to restore full N3 MCA functionality. SUPVIS-Justin:  The …

    Read Full Post

    ISS Daily Summary Report – 3/01/2018

    Plant Gravity Perception (PGP): Today the crew removed the Plant Gravity Perception seed cassettes from Experiment Containers (ECs) on the two European Modular Cultivation System (EMCS) rotors and stowed them in a Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI). They also replaced the ECs on the rotors with ECs for the next Plant …

    Read Full Post