ISS Daily Summary Report – 11/08/2017
Airway Monitoring: Using the Portable Pulmonary Function System (PFS), the crew performed calibrations and conducted high and low nitric oxide (NO) measurements in the US Laboratory. The Airway Monitoring investigation aims to determine the pulmonary nitric oxide turnover in weightlessness and in combined weightless, hypobaric and hypoxic environments, as well as the lung diffusion capacity for nitric oxide. With dust particles present in the ISS atmosphere, this investigation studies the occurrence and indicators of airway inflammation in crewmembers, using ultra-sensitive gas analyzers to analyze exhaled air. This will help to identify health impacts and support maintenance of crewmember well-being on future human spaceflight missions, such as to the Moon and Mars, where crewmembers will have to be more self-sufficient in identifying and avoiding such conditions.
Lighting Effects: A 52S crewmember provided a sleep log entry to track his daily sleep patterns and wakefulness. The Lighting Effects investigation studies the impact of the change from fluorescent light bulbs to solid-state light-emitting diodes (LEDs) with adjustable intensity and color and aims to determine if the new lights can improve crew circadian rhythms, sleep, and cognitive performance.
Fine Motor Skills (FMS): Today a 51S crewmember conducted a Flight Day 104 FMS session that was executed on a touchscreen tablet, where the subject performs a series of interactive tasks. The investigation studies how fine motor skills are affected by long-term microgravity exposure, different phases of microgravity adaptation, and sensorimotor recovery after returning to Earth gravity. The goal of FMS is to answer how fine motor performance in microgravity varies over the duration of a six-month and year-long space mission, how fine motor performance on orbit compare with that of a closely matched participant on Earth, and how performance trend/vary before and after gravitational transitions, including the periods of early flight adaptation, and very early/near immediate post-flight periods.
Earth Imagery from ISS Target Operations: The crew captured video footage of the Atlantic Ocean that continues to Northwest Africa, and footage of a thunderstorm in Italy that continues to East Europe. The crew also captured imagery of the Pacific Ocean before Singapore that continues over the coast between mainland China, Korea and Japan. The Earth Imagery from ISS investigation creates a series of videos, showcasing Earth from space. These videos will be taken with cameras on the International Space Station in 6K hi-resolution, then integrated into videos for screensavers for public enjoyment, exploration, and engagement.
Meteor Hard Drive Swap-out: The crew removed and replaced the hard drive in the Meteor laptop located in the Window Observational Research Facility (WORF). The Meteor payload is a visible spectroscopy instrument with the primary purpose of observing meteors in Earth orbit. Meteor uses image analysis to provide information on the physical and chemical properties of the meteoroid dust, such as size, density, and chemical composition. Since the parent comets or asteroids for most of the meteor showers are identified, the study of the meteoroid dust on orbit provides information about the parent comets and asteroids.
Joint Airlock Remote Power Control Module (RPCM) Remove and Replace (R&R): Today the crew rotated the A/L1F1 rack to access and replace the AL1A4A_B RPCM. The post-R&R checkout was successful. This RPCM powers Airlock redundant shell heaters. After the R&R, they inspected the Lower Left Launch Restraint on the A/L1F1 Rack. This Lower Left Launch Restraint was previously reported as stuck in the fully disengaged position. The crew was unable to engage the restraint. The rack is in an acceptable configuration with only 3 of 4 restraints, however.
Cygnus Offset Grapple On-Board Training (OBT): In preparation for Cygnus arrival, the crew practiced vehicle captures with the Space Station Remote Manipulator System (SSRMS), which was positioned at the Permanent Multipurpose Module (PMM) Flight Releasable Grapple Fixture (FRGF) High Hover position earlier this week in preparation for the training. Following the training, the crew participated in a conference with ground teams to discuss the training session and address any questions.
Permanent Multipurpose Module (PMM) Overhead 1 (O1) Rack Front Cleanup: The crew prepared the PMMO1 Rack Front to accept cargo during the upcoming Orbital ATK 8 (OA-8) mission by consolidating trash items and staging these items for disposal. During OA-8 cargo operations, these disposal items will be swapped with cargo that arrived on OA-8.
Node 2 Zenith International Docking Adapter (IDA) Control Panel Installation: The crew installed the IDA Control Panel bracket, IDA Control Panel, and cover on a Closeout Panel in Node 2. This Control Panel will be used to control the IDA at Node 2 Zenith during future Commercial Crew vehicles. After installation, the control panel was checked out successfully.
Today’s Planned Activities
All activities are complete unless otherwise noted.
- Lighting Effects Sleep Log Entry – Subject
- Regeneration of Micropurification Unit (БМП) Ф2 Cartridge (start)
- Photo/TV (P/TV) Airway Monitoring Video Setup
- Calibrations, Low NO and High NO measurements
- PMM1O1 Hardware Cleanup
- Fine Motor Skills Experiment Test – Subject
- Airlock Rack Rotate Down
- Video Recording of Greetings
- Health Maintenance System (HMS) Spaceflight Cognitive Assessment Tool for Windows (WinSCAT) Test
- MELFI Ice Brick transfer 1
- Download Pille Dosimeter Readings
- Airlock RPCM R&R
- Gathering equipment for checkout of water pump removed from Orlan-MK No.5 and procedure review.
- Consolidating ESA consumables and trash.
- MATRYOSHKA-R. Prep and Initialization of Bubble-Dosimeter Detectors
- Airlock Rack Inspection
- Checkout of water pump removed from Orlan-MK No.5.
- Meteor Hard Drive Swapout
- Airlock Rack Rotate Up
- Node 2 Zenith International Docking Adapter (IDA) Control Panel Installation
- SM БСК-1В СУБА equipment R&R prep.
- Checkout of the Node 2 Zenith International Docking Adapter (IDA) Control Panel.
- FROST2 Troubleshoot
- Nikon still camera sync with station time
- Node 2 Forward Endcone Stowage Replace
- Earth Imagery from ISS Crew Preference Target Operations
- Filling (separation) of ЕДВ [КОВ] for Elektron or ЕДВ-СВ
- VEG-03 Plant Photo
- Crew Choice Event
- VIZIR. Experiment Ops.
- СОЖ maintenance
- Public Affairs Office (PAO) Event in High Definition (HD) – JEM
- MELFI 3 Ice Brick Insert 4
- AIRMON Power off and Stow
- Delta file prep
- Verification of ИП-1 Flow Sensor Position
- Biolab Reference Experiment Container Removal
- URAGAN. Observation and Photography using VSS
- Airway Monitoring Video Stow
- On-board Training (OBT) Cygnus Offset Grapple
- Audit of ВБ-3М cradle pockets
- Miniature Exercise Device Procedure Review
- Miniature Exercise Device Surface Pro 3 Charge
- IWIS (Internal Wireless Instrumentation System) TAA (Tri-axial Accellerometer) Hardware Gather
- Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill
- Health Maintenance System (HMS) – ESA Nutritional Assessment
- Multi-purpose Small Payload Rack (MSPR) Two-Phase Flow Experiment Equipment Activation
- Onboard Training (OBT) SSRMS Debrief Conference
- Regeneration Micropurification Unit (БМП) Ф2 Absorption Cartridge (end)
Completed Task List Activities
- SSC10 (A/L). Connect to Wired
- VEG-03 Plant Pillow Water
Ground Activities
All activities are complete unless otherwise noted.
- MAA Powerup for Cygnus Offset Grapple
- ACBM Inspection
Three-Day Look Ahead:
- Thursday, 11/09: Lab CDRA Maintenance, IWIS TAA R&R, ITCS FSS Refill, Mini Exercise Device
- Friday, 11/10: Cygnus OBT, Stowage Consolidation, Earth Imagery, CBCS Install, HRF Operations
- Saturday, 11/11: Cygnus Launch, Weekly Housekeeping, Crew Off Duty
QUICK ISS Status – Environmental Control Group:
Component | Status |
Elektron | On |
Vozdukh | Manual |
[СКВ] 1 – SM Air Conditioner System (“SKV1”) | On |
[СКВ] 2 – SM Air Conditioner System (“SKV2”) | Off |
Carbon Dioxide Removal Assembly (CDRA) Lab | Standby |
Carbon Dioxide Removal Assembly (CDRA) Node 3 | Operate |
Major Constituent Analyzer (MCA) Lab | Idle |
Major Constituent Analyzer (MCA) Node 3 | Operate |
Oxygen Generation Assembly (OGA) | Process |
Urine Processing Assembly (UPA) | Standby |
Trace Contaminant Control System (TCCS) Lab | Full Up |
Trace Contaminant Control System (TCCS) Node 3 | Off |