Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

ISS Daily Summary Report – 10/20/2017

USOS Extra Vehicular Activity (EVA) #46: Randy Bresnik (as EV1) and Joe Acaba (as EV2) successfully performed US EVA #46 with a Phased Elapsed Time (PET) of 6 hrs 49 min. The primary goals of the EVA were to Remove and Replace (R&R) a fuse in the Special Purpose Dexterous Manipulator (SPDM) Enhanced ORU Temporary Platform (EOTP), install an External High Definition Camera (EHDC) at the Camera Port 3 (CP3) location, and install a new Camera/Light Assembly (CLA) on the Space Station Remote Manipulator System (SSRMS) Latching End Effector A (LEE A). The crew also removed Multi-Layer Insulation (MLI) from an Main Bus Switching Unit (MBSU) and tied down an MLI Skirt on a spare Direct Current Switching Unit (DCSU). The crew also performed the following get ahead tasks: Lubrication of the LEE A Linear Bearings, Prep of two Pump Modules (PMs) by removing the MLI straps and tape used for launch loads, and T-Handle installation on the Port Radiator Grapple Bar (RGB).

Circadian Rhythms: The 51S crewmember removed and stowed the Double Sensors and Thermolab Unit equipment that was used to complete a 36 hour Circadian Rhythms session that began on Wednesday. Circadian Rhythms investigates the role of synchronized circadian rhythms, or the “biological clock,” and how it changes during long-duration spaceflight. Researchers hypothesize that a non-24-hour cycle of light and dark affects crewmembers’ circadian clocks. The investigation also addresses the effects of reduced physical activity, microgravity and an artificially controlled environment. Changes in body composition and body temperature, which also occur in microgravity, can affect crewmembers’ circadian rhythms as well. Understanding how these phenomena affect the biological clock will improve performance and health for future crewmembers.

Space Headaches: Today a 51S crewmember completed a weekly questionnaire for the ESA Space Headaches investigation. The Space Headaches investigation collects information that may help in the development of methods to alleviate associated symptoms and improvement in the well-being and performance of crewmembers in space. Headaches during space flight can negatively affect mental and physical capacities of crewmembers that can influence performance during a space mission.

Today’s Planned Activities
All activities were completed unless otherwise noted.

  • Life On The Station Photo and Video
  • Glisser GoPro HERO3 battery charge
  • Roskosmos and social media features preparation
  • URAGAN. Observation and photography
  • ECON-M. Observation and photography
  • Extravehicular Activity (EVA) Reminder for EVA In-Suit Light Exercise (ISLE) Preparation
  • ISS HAM Radio Power Down in Columbus
  • USOS Extravehicular Activity (EVA) Communication Configuration
  • ISS HAM Radio Power Down in Service Module
  • EVA COTS UHF Communication Unit (CUCU) Verify off
  • USOS Window Shutter Close
  • Extravehicular Activity (EVA) In-Suit Light Exercise (ISLE) Preparation
  • Daily Planning Conference
  • MORNING PREPARATION WORK
  • PAO hardware setup. Audi/Video check with Glavny (Ku + S-band)
  • Crew Prep for PAO
  • Circadian Rhythms Deinstrumentation
  • TV Conference with the participants of XXV International Space Olympiad (Ku + S-band)
  • MICROVIR. Photography of Cassette-M No.3-3, No.3-4 upper cells. Squeezing out and photography of bottom cells. Tagup with specialists as necessary
  • Extravehicular Mobility Unit (EMU) Purge
  • MICROVIR. Glovebox-S Closeout Ops
  • Extravehicular Mobility Unit (EMU) In-Suit Light Exercise (ISLE) Prebreathe
  • Monitoring shutter closure on SM windows 6, 8, 9, 12, 13, 14. Note 5
  • COSMOCARD. Setup. Starting 24-hr ECG Recording
  • COSMOCARD. Photography of the Experiment Session
  • Portable Onboard Computers (POC) Dynamic Onboard Ubiquitous Graphics (DOUG) Setup
  • Extra-Vehicular Mobility Unit (EMU) In-Suit Light Exercise Prebreathe
  • BIOPLENKA. Removal of Cryogem-03 after Completion of the Experiment
  • MICROVIR. Photography of bottom cells
  • Crewlock Depress
  • Tightening Fast-Removal Screw Clamps on SM Aft – Progress 436 Interface
  • Photography of Plume Impingement and Deposit Monitoring Unit (БКДО) position on MRM2 through SM window No.13, preparation
  • Crewlock Post Depress
  • Crewlock Egress
  • Photography of Plume Impingement and Deposit Monitoring Unit (БКДО) position on MRM2 through SM window No.13
  • Photography of Plume Impingement and Deposit Monitoring Unit (БКДО) position on MRM2 through SM window No.13, Closeout Ops
  • Enhanced ORU Temporary Platform (EOTP) Fuse R&R
  • SSRMS EVA Support
  • SSRMS Setup for C9 Ops
  • SSRMS EVA Support
  • CP3 External High Definition Camera (EHDC) Install
  • Main Bus Switching Unit (MBSU) Multi-Layer Insulation (MLI) Remove
  • Draining Disinfectant into ЕДВ and SM Rodnik Water Tank 1 bladder compression
  • MICROVIR. Photography of bottom cells
  • Progress 437(DC1) priority and US cargo items transfers and IMS Ops
  • Direct Current Switching Unit (DCSU) Skirt Tie down
  • SSRMS Cleanup
  • Camera Light Assembly (CLA) R&R
  • СОЖ maintenance
  • IMS Update
  • SSRMS Powerup
  • SM ПФ1-4 Dust Collector Filter Cartridge Changeout (ФГБ1ПГО_2_224_1, bag 436-26 (00071452R)). Discard the removed items. Reflect changes in IMS)
  • MICROVIR. Photography of bottom cells
  • Articulating Portable Foot Restraint (APFR) Cleanup
  • Crewlock Ingress
  • Evening Preparation Work
  • EVA Glove Photo Setup
  • Crewlock Pre Repress
  • Crewlock Repress
  • Extra Vehicular Activity (EVA) Post-EVA Activities
  • MICROVIR. Photography of bottom cells
  • Cupola Window Shutter 4 Close
  • Space Headaches – Weekly Questionnaire
  • Post Extravehicular Activity (EVA) Communication Deconfiguration
  • SM Water Tank 1 Bladder Compression, Cleanup Ops
  • EVA Glove Photo Downlink
  • Extravehicular Activity (EVA) Camera Image Downlink
  • Photo/TV Extravehicular Activity (EVA) GoPro Downlink

Completed Task List Activities

  • Wanted Poster: (20-100 in-oz) Trq Driver, 1/4 Drive
  • ECG Device, ECG Lead Set Cable, and ECG USB Charge Cable Audit

Ground Activities
All activities were completed unless otherwise noted.

  • SSRMS Powerup
  • EVA Support

Three-Day Look Ahead:

  • Saturday, 10/21: EMU Water Charge, EVA Debrief, Airlock Reconfig
  • Sunday, 10/22: Off duty
  • Monday, 10/23: KE2M Installation on JEMAL Slide Table, World in 90 Minutes Photography, ENERGY, CQ Battery Replacement

QUICK ISS Status – Environmental Control Group:

Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

Off

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

Off

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Idle

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Process

Urine Processing Assembly (UPA)

Standby

Trace Contaminant Control System (TCCS) Lab

Full Up

Trace Contaminant Control System (TCCS) Node 3

Off