ISS Daily Summary Report – 08/19/2016
U.S. Extravehicular Activity (EVA) #36: Williams (EV-1) and Rubins (EV-2) completed the following activities to install the International Docking Adapter (IDA)2 with Intravehicular (IV) support from FE-5:
- Pressurized Mating Adapter (PMA)-2 setup
- Preliminary IDA installation
- Initial IDA cable installation
- PMA-2 hemi reflector cover installation
- Final IDA cable installation
- IDA outfitting
- IDA cleanup
- IDA3 cable routing
- Multiplexer/Demultiplexer (MDM) ethernet cable connection
- MDM ethernet cable routing
- Station/Shuttle Power Transfer System (SSPTS) cap removal
Tomorrow the crew will perform post-EVA cleanup activities and a post-EVA debrief with ground teams.
Today’s Planned Activities
All activities were completed unless otherwise noted.
- Closing USOS Window Shutters
- Powerdown the CUCU for US EVA
- US EVA, In-Suit Light Exercise (ISLE) Preparation
- Comm configuration for EVA
- EMU Prep for EVA
- Prebreathe in EMU
- US EVA, Crew Lock Depress
- US EVA, Post Depress and A/L Egress
- US EVA, Crew Lock Egress
- US EVA, PMA-2 Setup
- US EVA, IDA Pre-install
- IV support during US EVA
- US EVA, IDA Preliminary Installation
- СОЖ Maintenance
- US EVA, PMA2 Hemi-Reflector Cover Installation
- US EVA, IDA Final Cable Installation
- US EVA, NODE2 Ops in Preparation for IDA2 Installation
- US EVA, IDA Outfitting
- US EVA, Cleanup
- US EVA, SSP Ops
- US EVA, Connecting MDM Cables
- US EVA, Installation of white-green cable
- MDM computer cable connection
- EVA Glove Photo Setup
- US EVA, Cleanup and Crewlock Ingress
- Closing USOS Window Shutters
- US EVA, Crew Lock Repress
- Crew Lock Repress
- Post-EVA Activities
- Post-EVA communication reconfig
- EVA Glove Photo Downlink
- EVA Imagery Downlink
- Waste Hygiene Compartment (WHC) Inhibit the Pump Separator BK1 sensor [Aborted]
Completed Task List Items
- None
Ground Activities
All activities were completed unless otherwise noted.
- EVA operations
- Nominal ground commanding
Three-Day Look Ahead:
- Saturday, 08/20: Post EVA cleanup activities, EVA debrief, Heart Cells media change, Mouse cage maintenance, CMO OBT
- Sunday, 08/21: Crew off duty
- Monday, 08/22: Crew off duty (payback for Saturday’s post-EVA activities)
QUICK ISS Status – Environmental Control Group:
Component | Status |
Elektron | On |
Vozdukh | Manual |
[СКВ] 1 – SM Air Conditioner System (“SKV1”) | Off |
[СКВ] 2 – SM Air Conditioner System (“SKV2”) | On |
Carbon Dioxide Removal Assembly (CDRA) Lab | Standby |
Carbon Dioxide Removal Assembly (CDRA) Node 3 | Operate |
Major Constituent Analyzer (MCA) Lab | Idle |
Major Constituent Analyzer (MCA) Node 3 | Operate |
Oxygen Generation Assembly (OGA) | Process |
Urine Processing Assembly (UPA) | Norm |
Trace Contaminant Control System (TCCS) Lab | Off |
Trace Contaminant Control System (TCCS) Node 3 | Full Up |