ISS Daily Summary Report – 05/12/15
Rodent Research-2 Center for the Advancement of Science in Space (RR-2 CASIS): Kelly performed a fixative flush and swapped the samples collected yesterday which he inserted into MELFI. The primary objective of this research is to monitor the effects of the space environment on the musculoskeletal and neurological systems of mice as model organisms of human health and disease. Living in microgravity results in significant and rapid effects on the physiology of mice that mimic the process of aging and some diseases in humans on Earth, including muscle atrophy and the loss of bone mineral density. This project will help scientists to discover new molecular targets that can facilitate the development of novel therapeutics for the treatment of muscle and bone-related diseases. Long-duration exposure to microgravity will also induce changes in gene expression, protein synthesis, metabolism, and eye structure/morphology that will be identifiable as a series of assessable biomarkers for tracking the onset and progression of disease.
1-Year Mission (1YM) Human Research Program (HRP) Science Operations: Kelly performed the following suite of HRP activities today.
- The Sleep ISS-12 experiment monitors ambient light exposure and crew member activity and collects subjective evaluations of sleep and alertness to examine the effects of space flight and ambient light exposure on sleep during a year-long mission on the ISS.
- In the Fine Motor Skills experiment, crew members perform a series of interactive tasks on a touchscreen tablet. The investigation is the first fine motor skills study to measure long-term microgravity exposure, different phases of microgravity adaptation, and sensorimotor recovery after returning to Earth gravity.
- Individualized Real-Time Neurocognitive Assessment Toolkit for Space Flight Fatigue (Cognition) is a battery of tests that measure how spaceflight-related physical changes, such as microgravity and lack of sleep, can affect cognitive performance. Cognition includes ten brief computerized tests that cover a wide range of cognitive functions, and provides immediate feedback on current and past test results. The software allows for real-time measurement of cognitive performance while in space.
Combustion Integration Rack (CIR) Hardware Gather: Virts gathered the equipment for the CIR reconfiguration from FLame Extinguishment Experiment (FLEX)-2 to the FLEX-2J scheduled for Wednesday.
Node 1 (N1) and Node 2 (N2) Bacteria/Charcoal Filter Remove & Replace (R&R): Virts removed N1 bacteria filters and replaced them with charcoal filters. Using charcoal filters in Node 1 will reduce the ISS atmospheric Polydimethylsiloxane (PDMS) concentration. Reducing the PDMS atmospheric concentration will subsequently reduce the quantity of dimethylsilanediol (DMSD) produced in the Common Cabin Air Assembly (CCAA) Condensing Heat Exchangers, thereby extending the life of the Multifiltration (MF) Beds that are in a zero spare posture. The bacteria filters that were removed from the N1 will replace the N2 Bacteria filters that were scheduled to be replace per preventative maintenance schedule.
Robotics Refueling Mission (RRM) Hardware Removal: Following the conclusion of last week’s RRM activities, Cristoferetti extended the JEMAL Slide Table (ST) into the Japanese Experiment Module Pressurized Module (JPM), brought the RRM Task Board-2 and Safety Cap Tool (SCT) into the ISS habitable volume and removed them from the JEMAL ST. The ST was then retracted from the JPM side and the inner hatch was closed.
Node 1 (N1) Stowage/Relocation: Cristoferetti began this activity to move infrequently used hardware from N1 to Permanent Multipurpose Module (PMM)-1. This is to create space in the N1 for food stowage and the Galley Rack scheduled to arrive in August on H-II Transfer Vehicle (HTV)-5.
Dragon Cargo Transfer Operations: As of today, the crew has approximately 11 hours of SpX-6 cargo operations remaining.
Today’s Planned Activities
All activities were completed unless otherwise noted.
- SLEEP – Questionnaire
- Regeneration of БМП Ф2 Micropurification Cartridge (start)
- Cleaning fan grilles on FGB interior 201, 301, 401
- PROX Power Switch ON
- Life On The Station Photo and Video
- Node 1 Stowage – Part 3
- CIR Hardware Gather
- FINEMOTR – Experiment Ops
- RRM. OBT, Procedure Overview
- Cleaning fan grilles on FGB interior panels 116, 316, 231, 431
- Robotic Refueling Mission (RRM) Removal Procedure Review
- MRM1-FGB Screw Clamp Tightening
- JEM Airlock Slide Table (ST) Extension to JPM Side
- DRAGON. Transfers Ops
- Verification of ИП-1 Flow Sensor Position
- RRM. Hardware Assembly
- VIZIR. Experiment Ops
- Dust Filter Replacement and MRM1 Gas-Liquid Heat Exchanger Cleaning
- Activation of FS1 File Server.
- JEM Airlock – Slide Table Retraction
- СТТС Configuration for MRM2
- Heart Rate Monitor (HRM) iPad Data Transfer to ISS Server
- WRS – Recycle Tank Fill from EDV
- Testing iPAD full network access capabilities on the RS.
- Replacing ИДЭ-3 Smoke Detectors in MRM2
- PROX Switch OFF
- DRAGON. Transfers Ops
- Audit of ВП1 fuses in SM
- Rodent Research (RR) – Fixative Swap
- Node 1 Bacteria/Charcoal Filter Remove and Replace
- DRAGON. Transfers Ops
- ALGOMETRIA. Experiment Ops
- Test activation of Vozdukh Atmosphere Purification System Emergency Vacuum Valves
- ISS RS Plug-In Audit
- Changeout of Dust Filter Cartridges in SM
- Dragon -Transfers Tagup
- Node2 Bacteria/Charcoal Filter Remove and Replace
- Dragon Cargo Operations Conference
- СОЖ Maintenance
- Rodent Research (RR) – Sample MELFI Insertion
- MSG – Powerdown
- Rodent Research (RR) – Cleaning Animal Access Unit
- WRS – Recycle Tank Fill from EDV
- IMS Delta File Prep
- Historical Documentation. Photography of Synthetic Muscle
- Relocate Rodent Tissue Boxes returning on SpX-6 and stow ACE Heated sample which arrived on SpX-6
- CIR – Post-Experiment Hardware Stowage
- MDCA – Multi-User Droplet Combustion Apparatus MWA Prep
- COGN – Experiment Ops and Questionnaire
- БМП Ф2 Absorption Cartridge Regeneration (end)
Completed Task List Items
- None
Ground Activities
All activities were completed unless otherwise noted.
- N3 CDRA Bed Leak Check
- HTV5 Prox Ops Checkout
Three-Day Look Ahead:
- Wednesday, 05/13: Twin Studies, RR habitat stow, MDCA h/w replace, SAM install, N3 Power reconfiguration, IMAK unpack
- Thursday, 05/14: N1 and N3 SDS Valve Install, HXP sampling
- Friday, 05/15: Restocking rodent habitat, Micro Observatory sampling, FPEF MD10 removal
QUICK ISS Status – Environmental Control Group:
Component | Status |
Elektron | On |
Vozdukh | Manual |
[СКВ] 1 – SM Air Conditioner System (“SKV1”) | On |
[СКВ] 2 – SM Air Conditioner System (“SKV2”) | Off |
Carbon Dioxide Removal Assembly (CDRA) Lab | Operate |
Carbon Dioxide Removal Assembly (CDRA) Node 3 | Standby |
Major Constituent Analyzer (MCA) Lab | Shutdown |
Major Constituent Analyzer (MCA) Node 3 | Operate |
Oxygen Generation Assembly (OGA) | Process |
Urine Processing Assembly (UPA) | Process |
Trace Contaminant Control System (TCCS) Lab | Off |
Trace Contaminant Control System (TCCS) Node 3 | Full Up |