Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from March 2015

View All Posts

    ISS Daily Summary Report – 03/17/15

    Node 3 Carbon Dioxide Removal Assembly (CDRA):  Overnight the Flight Control Specialist’s attempt to repower Node 3 CDRA failed due to both CDRA bed heaters reporting as failed.  The ppCO2 levels remain low and preliminary assessment level will remain below limits with no CDRA for a couple days.  The team has been able to override …

    Read Full Post

    ISS Daily Summary Report – 03/16/15

    Biolab Troubleshooting (TripleLux-B):  In order to recover smoke detection in the Biolab facility, Cristoforetti successfully Removed and Replaced (R&R) the smoke detector. She also performed an inspection of the Biolab handling mechanism shutter door. Photos were taken for evaluation by ground teams.  Ground teams have performed activation steps and verified that Biolab is go for …

    Read Full Post

    ISS Daily Summary Report 03/13/15

    Japanese Experiment Module Airlock (JEMAL) Activation: Virts pressurized and then perform a leak check of the JEMAL. These tasks were performed in advance of operations on March 25 to remove the NanoRacks CubeSat Deployer (NRCSD) and Multi-Purpose Experiment Platform (MPEP)/Small Fine Arm Attachment Mechanism (SAM) from the slide table. Minus Eighty Degree Celsius Laboratory Freezer …

    Read Full Post

    ISS Daily Summary Report – 03/11/15

    40 Soyuz (40S) Undock and Landing: 40S undocked at 5:45pm CDT today bringing Wilmore, Serova and Samokutyaev back to Earth. Landing occurred at 9:07pm in Kazakhstan. The ISS will be in 3-crew operations until 42S docking on May 28. Biolab Troubleshooting (TripleLux-B):  Cristoforetti performed troubleshooting to recover smoke detection in the Biolab facility.  She removed …

    Read Full Post

    ISS Daily Summary Report – 03/10/15

    Russian Joint Research (RJR) Augmented Microbial Sampling:  Shkaplerov collected samples from various locations throughout the ISS that are prone to microbial contamination.  Samples will be returned on 40S.  The data gathered and monitoring technologies used in Augmented Microbial Sampling are shared between NASA and Roscosmos. The purpose is to provide a scientific basis for decisions …

    Read Full Post

    ISS Daily Summary Report – 03/09/15

    Mobile Servicing System (MSS) Operations: On Saturday, Robotics Ground Controllers powered up the Mobile MSS cameras and maneuvered the Space Station Remote Manipulator System (SSRMS) to move the Special Purpose Dexterous Manipulator (SPDM) into position to install the spare Pump Module (PM) on External Stowage Platform (ESP) 2.  SPDM Arm 2 then installed the PM …

    Read Full Post

    ISS Daily Summary Report – 03/06/15

    Airway Monitoring Experiment: The crew prepared the airlock by removing equipment, transferring and setting up Airway Monitoring hardware and configuring a video camera. This experiment was performed in the US airlock at 10.2 psi pressure with the hatch closed. This is the first time the US equipment lock (as a hypobaric facility) was used for …

    Read Full Post

    ISS Daily Summary Report – 03/05/15

    NanoRack Cubesat Deployer (NRCSD):  The final 2 CubeSats were successfully deployed overnight which concludes deployment activities for this increment. A total of 16 satellites have been deployed. Airway monitoring:  The crew reviewed information to familiarize themselves with the Airway Monitoring experiment.  Specialists on the ground were available to answer crew questions. To prepare for Friday’s …

    Read Full Post

    ISS Daily Summary Report – 03/04/15

    NanoRack Cubesat Deployer (NRCSD):  Wilmore performed visual inspection of NRCSD secondary latches, confirming their configuration after extension and retraction. He also took photos and downlinked to ground teams for review.  Four CubeSats were successfully deployed overnight. The last 2 CubeSats are scheduled for deploy tonight.  Microbial Observatory:  Virts held a crew conference with the Microbial …

    Read Full Post

    ISS Daily Summary Report – 03/03/15

    Nanoracks CubeSat Deployer (NRCSD): Overnight, 4 Dove satellites were successfully launched from Deployers 5 and 6. Two additional deploys are scheduled for this evening.  Cardio Ox: The Crew set up and configured ultrasound hardware.  Cristoforetti acted as Crew Medical Officer (CMO) to support Wilmore’s return minus 15 days (R-15) Cardio Ox session.  With guidance from …

    Read Full Post