ISS Daily Summary Report – 06/12/13
New Status:
Crew Holiday: Today the crew observed Russia Day, one of the four holidays they selected pre-Increment. The Russian crewmembers were off duty and the USOS crewmembers performed light duty operations.
Periodic Fitness Evaluation (PFE): FE-3 Cassidy with the assistance of FE-5 Parmitano performed his third monthly PFE. The purpose of this activity is to monitor crewmembers’ overall fitness levels to ensure that cardiovascular and musculoskeletal health and performance is satisfactory. The activity consists of performing a graded exercise test on the Cycle Ergometer with Vibration Isolation and Stabilization (CEVIS).
Periodic Health Status (PHS): Parmitano and FE-6 Nyberg, with Cassidy assisting as a Crew Medical Officer (CMO), completed their Flight Day (FD) 14 PHS activities, logging vitals and documenting their general physical status.
Today’s Planned Tasks
· PLAZMENNIY KRISTALL. Pressure Check [Complete]
· HRF Blood Draw and Stow Prep [Complete]
· HRF – Sample Insertion into MELFI [Complete]
· Audio Dosimeter Preparation [Complete]
· PHS Evaluation Setup [Complete]
· ARED Flywheel Cylinder Evacuation [Complete]
· Periodic Fitness Evaluation [Complete]
· BRI Reconfiguration [Complete]
· HRF – Post-Experiment Hardware Stowage [Complete]
· PLAZMENNIY KRISTALL. Hardware Activation and Experiment Start. TV [Complete]
· PLAZMENNIY KRISTALL. Perform Experiment in Manual Mode [Complete]
· СОЖ Maintenance [Complete]
· Replace T-hose И-У-Р3-РУ7 Install [Complete]
· PLAZMENNIY KRISTALL. Experiment End. Tagup with specialists [Complete]
· Elektron-VM Liquid Unit Pressurization before Activation [Complete]
· P/TV – Encoder XF305 Test in NODE 2 [Complete]
· WRS Water Sample Analysis [Complete]
· CCE Hardware Setup [Complete]
· PLAZMENNIY KRISTALL. Pressure Check [Complete]
· Preparation of reports for Roskosmos site [Complete]
· URAGAN Observations and Photography [Complete]
· ECON-M. Observations and Photography [Complete]
Task List
· CEO Ops [Complete]
· ISS Crew Handover [Complete]
· WHC KTO replace
· WHC EDV R&R
· Cue card trash
· Preparation of reports for Roskosmos site
· ECON-M. Observations and Photography
· URAGAN Observations and Photography
· CIR Bottle Reorganization [Complete]
· EVA Connector Insulating Sleeve Wanted Poster [In Work]
· Payload Trash Gather [Complete]
Ground
· Nominal Commanding
· MT Translate
Three-Day Look Ahead:
Thursday, June 13: RS EVA Tool Gather, MSG AAA Fan Cleaning, CFE Ops
Friday, June 14: RS EVA Prep, Weekly Cleaning, USOS Off-duty
Saturday, June 15: ATV4 Docking, CFE
QUICK ISS Status – Environmental Control Group:
Component | Status |
Elektron | On |
Vozdukh | On |
[СКВ] 1 – SM Air Conditioner System (“SKV1”) | On |
[СКВ] 2 – SM Air Conditioner System (“SKV2”) | Off |
Carbon Dioxide Removal Assembly (CDRA) Lab | Standby |
Carbon Dioxide Removal Assembly (CDRA) Node 3 | Operate |
Major Constituent Analyzer (MCA) Lab | Off |
Major Constituent Analyzer (MCA) Node 3 | Operate |
Oxygen Generation Assembly (OGA) | Process |
Urine Processing Assembly (UPA) | Standby |
Trace Contaminant Control System (TCCS) Lab | Off |
Trace Contaminant Control System (TCCS) Node 3 | Full Up |