Suggested Searches

Blogs

  • October 2016 Puzzler

    Every month on Earth Matters, we offer a puzzling satellite image. The October 2016 puzzler is above. Your challenge is to use the comments section to tell us what part of the world we are looking at, when the image was acquired, what the image shows, and why the scene is interesting. How to answer. Your answer can be […]

  • First Half of Platform B Arrives for NASA’s Space Launch System

    First half of Platform B arrives at Kennedy Space Center.

    The first half of the B-level work platforms, B south, for NASA’s Space Launch System (SLS) rocket, arrived by heavy-load transport truck at the agency’s Kennedy Space Center in Florida on Oct. 21. The B platforms are the ninth of 10 levels of new platforms for High Bay 3 in the Vehicle Assembly Building (VAB). …

  • ISS Daily Summary Report – 10/24/2016

    Bigelow Expandable Activity Module (BEAM) Ingress and Sampling: FE-6 stowed the Advanced Resistive Exercise Device (ARED) then opened Node3 Aft hatch to ingress the BEAM.  Once inside, the crew collected Microbial Air Sampler (MAS) and Surface Sample Kit (SSK) microbial and surface samples and deployed the Radiation Area Monitors (RAMs) delivered on 48Soyuz (48S).  The …

  • ISS Daily Summary Report – 10/23/2016

    Cygnus Rendezvous and Capture:  This morning the crew monitored the Cygnus approach from the Cupola Robotic Workstation and successfully captured Cygnus using the Space Station Remote Manipulator System (SSRMS) at 6:28 am CDT.  The Ground Robotics team maneuvered Cygnus into position to inspect the Passive Common Berthing Mechanism (CBM), and berthed Cygnus onto the Node-1 …

  • Cygnus Attached to Station’s Unity Module

    Space Station Configuration

    Orbital ATK’s Cygnus cargo spacecraft was berthed to the Unity module of the International Space Station at 10:53 a.m. EDT. The Expedition 49 crew will begin unloading approximately 5,000 pounds of science investigations, food and supplies when the hatch between the newly arrived spacecraft and the Unity module of the space station is opened. The …

  • Station Robotic Arm Grapples Cygnus Resupply Ship

    The Cygnus Resupply Ship

    Expedition 49 Flight Engineers Takuya Onishi of the Japan Aerospace Exploration Agency and Kate Rubins of NASA successfully captured Orbital ATK’s Cygnus spacecraft with the station’s robotic arm at 7:28 a.m. EDT. NASA TV coverage of operations to install Cygnus to the space station’s Unity module begins at 9 a.m. Get weekly video highlights at: http://jscfeatures.jsc.nasa.gov/videoupdate/

  • ISS Daily Summary Report – 10/21/2016

    48 Soyuz (48S) Dock: 48S launched from the Baikonur Cosmodrome on Wednesday, October 19th, and docked to the ISS this morning bringing Ryzhikov, Borisenko, and Kimbrough to the ISS. Docking to the Mini Research Module-2 (MRM-2) module was completed at 4:53 am CDT with hatch opening at 7:20 am CDT. Today’s docking increases the ISS …

  • Orion Service Module Umbilical Testing Wraps Up at Launch Equipment Test Facility

    OSMU testing is complete at the Launch Equipment Test Facility at Kennedy Space Center.

    Testing of the Orion Service Module Umbilical (OSMU) is complete at the Launch Equipment Test Facility at NASA’s Kennedy Space Center in Florida. A series of tests, called regressions tests, were performed on the umbilical’s design modifications to validate it for installation on the mobile launcher. The tests were conducted by Kennedy’s Engineering Directorate for …

  • Engineers Prep to Encapsulate GOES-R for November Launch

    Processing engineers are set to encapsulate the GOES-R weather satellite into its payload fairing at the Astrotech payload processing facility near NASA’s Kennedy Space Center in Florida. The work is being performed as teams from NASA, United Launch Alliance and NOAA progress toward a liftoff on Nov. 16 from Space Launch Complex 41 aboard an …

  • R/V Revelle SPURS-2 Epilogue

    By Eric Lindstrom Salinity Processes in the Upper-ocean Regional Study #2 is underway for the next year. Lots of science remains to be done, so it is very early to be writing an epilogue! However, the first big field campaign with a large research ship is completed and it seems right to sum up some […]