Suggested Searches

Artemis

Viewing Posts from November 2022

View All Posts

    Orion Solar Array Deployment Complete

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    Orion’s solar arrays have completed their deployment. The arrays are drawing power, and early data suggests good performance. The next milestone will be a perigee raise maneuver targeted for approximately 2:41 a.m. EST to raise Orion’s orbit in preparation for the critical trans-lunar injection that will send Orion to the Moon.

    Read Full Post

    Core Stage Main Engine Cutoff, Core Stage Separation Complete

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    Space Launch System core stage main engine cutoff is complete, and the core stage has separated from the interim cryogenic propulsion stage and Orion spacecraft. The next milestone is deployment of Orion’s solar arrays, scheduled to begin approximately 18 minutes after launch.

    Read Full Post

    Solid Rocket Booster Separation Complete

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    The Space Launch System’s (SLS) solid rocket boosters have successfully jettisoned. The SLS core stage will continue to fire until 8 minutes after launch. In about one minute, the service module fairing and launch abort system will separate from the Orion spacecraft.

    Read Full Post

    Artemis I Liftoff

    NASA’s Space Launch System rocket, carrying the uncrewed Orion spacecraft lifted off from Launch Complex 39B in Florida at 1:47 a.m. EST. The primary goal of Artemis I is to thoroughly test the integrated systems before crewed missions by operating the spacecraft in a deep space environment, testing Orion’s heat shield, and recovering the crew …

    Read Full Post

    Teams to Target New Launch Time

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    Teams have extended their planned 30-minute hold, and mission managers are expected to target a new time for launch. The Eastern Range and launch teams have since resolved an issue that caused a loss of signal from a radar site and are currently in the process of conducting required tests to ensure communication and tracking …

    Read Full Post

    Core Stage Liquid Hydrogen Back in Replenish, Upper Stage in Fast Fill

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    Teams are replenishing liquid hydrogen into the core stage and report seeing good data where a red crew tightened connections in the area of a leaky valve on the mobile launcher. The leak is not reoccurring. Engineers are back into liquid hydrogen fast fill operations on the interim cryogenic propulsion stage. Engineers also are tracking …

    Read Full Post

    Red Crew Departs Pad

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    The red crew has departed the launch pad and is now outside the designated danger area surrounding the pad. The technicians entered the zero deck, or base, of the mobile launcher and tightened several bolts to troubleshoot a valve used to replenish the core stage with liquid hydrogen which showed a leak with readings above …

    Read Full Post

    Red Crew Arrives at Pad

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    Technicians who are part of the “red crew” of personnel specially trained to conduct operations at the launch pad during cryogenic loading operations have arrived at the launch pad. They will enter the zero deck or base of the mobile launcher to tighten connections to ensure a hydrogen valve used to replenish the core stage …

    Read Full Post