ISS Daily Summary Report – 7/16/2020
Systems
USOS Extravehicular Activity (EVA) #67/S6 Battery EVA #3: Bob Behnken (EV1) and Chris Cassidy (EV2) performed a 6 hour EVA that completed the following tasks in support of the S6 Channel 3B battery transition from nickel hydrogen to lithium-ion batteries:
- S3 Boom Install
- NiH2 Battery 1 from S6 Integrated Equipment Assembly (IEA) to External Pallet (EP)
- Li-Ion Battery F from EP to S6 IEA Slot 1
- NiH2 Battery 2 from S6 IEA to EP / Adapter Plate F from EP to S6 IEA Slot 2
- NiH2 Battery 3 from S6 IEA Slot 3 to Adapter Plate F in Slot 2
- Li-Ion Battery E from EP to S6 IEA Slot 3
- NiH2 Battery 4 from S6 IEA to EP / Adapter Plate E from EP to S6 IEA Slot 4
- NiH2 Battery 6 from S6 IEA slot 6 to Adapter Plate E
- Li-Ion Battery C from EP to S6 IEA Slot 6
- NiH2 Battery 5 from S6 IEA to EP (get ahead)
- Adapter Plate C from EP to S6 IEA Slot 5 (get ahead)
The ground team was able to successfully checkout all 3 newly installed lithion-ion batteries. As a result of the getahead tasks the EV crew completed, ground teams can begin to power up the 3B Channel.
Completed Task List Activities:
- None
Today’s Ground Activities:
All activities are complete unless otherwise noted.
- Ground Support for EVA #67
Look Ahead Plan
Friday, 7/17 (GMT 199)
Payloads:
- Food Physiology Brief (NASA)
Systems:
- Post-EVA PHS Exams
- EMU Water Recharge
- EVA Procedure Review/Debrief Conference
- Recycle Tank Drain/Fill
- UPA Brine Filter Gather/R&R
Saturday, 7/18 (GMT 200)
Payloads:
- Off Duty Day
Systems:
- USOS Shutter Close
- EVA Camera Port 3 Bag Prep
- EVA METOX Ops
Sunday, 7/19 (GMT 201)
Payloads:
- No Payload Activities
Systems:
- EVA Procedure Review/Conference
- RELL RITS Install
- EVA Tool Config
- EVA Cuff C/L Print
- (EVA) Kapton Tape Scraper (KaTS) Build
Today’s Planned Activities:
All activities are complete unless otherwise noted.
- NEUROIMMUNITET. Saliva sample collection. Pamyat (Memory) test. Photography. Data Transfer
- USOS Extravehicular Activity (EVA) Communication Configuration/Deconfiguration
- ISS HAM Radio Power Down in Columbus
- EVA COTS UHF Communication Unit (CUCU) Verify off
- ISS HAM Radio Power Down in Service Module
- Extravehicular Activity (EVA) In-Suit Light Exercise (ISLE) Preparation
- Regeneration of Micropurification unit (БМП) Ф1 and Ф1 cartridge
- Checking cover closure on SM windows 6, 8, 9, 12, 13, 14
- Extravehicular Mobility Unit (EMU) Purge
- Extravehicular Mobility Unit (EMU) In-Suit Light Exercise (ISLE) Prebreathe
- Weekly changeout of RS video recording equipment
- Crewlock Depress
- Filling (degassing) ЕДВ [КОВ] for Elektron or ЕДВ-[СВ]
- Crewlock Post Depress
- Crewlock Egress
- SSRMS EVA Setup
- S3 Boom Install
- EVA Worksite Preparation
- Move Battery 1 to EP Z
- SSRMS EVA Support
- Move Battery F to Slot 1
- Move Battery 2 to EP F / AP F to Slot 2
- БД-2 Semi-Annual Maintenance
- Move Battery 3 to AP F Slot 2
- Move Battery E to Slot 3
- Move Battery 4 to EP E/ AP E to Slot 4
- Move Battery 6 to AP E Slot 4
- Nikon camera sync with station time
- Move Battery C to Slot 6
- EVA Crew Lock Ingress
- EVA Glove Photo Setup
- Crewlock Pre Repress
- Crewlock Repress
- Extra Vehicular Activity (EVA) Post-EVA Activities
- EVA Glove Photo Downlink
- Photo/TV Extravehicular Activity (EVA) Camera Disassembly
- Photo/TV Extravehicular Activity (EVA) GoPro Downlink