Due to the lapse in federal government funding, NASA is not updating this website.

Suggested Searches

1 min read

Shuttle Tile Installation

In Orbiter Processing Facility-1, a thermal protection system technician inspects the area on shuttle Atlantis' underside before a heat shield tile is installed.
In Orbiter Processing Facility-1, a thermal protection system technician inspects the area on shuttle Atlantis' underside before a heat shield tile is installed. The tiles are part of the Orbiter Thermal Protection System that protected the shuttle against temperatures as high as 3,000 degrees Fahrenheit during the descent for landing.

In Orbiter Processing Facility-1, a thermal protection system technician inspects the area on shuttle Atlantis’ underside before a heat shield tile is installed. The tiles are part of the Orbiter Thermal Protection System that protected the shuttle against temperatures as high as 3,000 degrees Fahrenheit during the descent for landing.
Image credit: NASA/Jack Pfaller
Feb. 17, 2011