
Control Room in the H Control Building at Plum Brook Station
Test engineers monitor A Site controls inside the H Control Building during tests of three-stage axial flow turbopumps (5/14/1963).
Image Credit: NASA
- X
https://www.nasa.gov/image-detail/grc-1963-p-01435/
Image CreditNASA
Size2843x2168px