
Construction of Altitude Wind Tunnel Shell
Construction of the Altitude Wind Tunnel (AWT) in April 1943. The facility would be up and running in eight months.
Image Credit: NASA
- X
https://www.nasa.gov/image-detail/construction-of-altitude-wind-tunnel-shell/
Image CreditNASA
Size2039x1457px