ED15-0137-59
The Hybrid-Electric Integrated Systems Testbed performs a full-power ground test at 224 kW of Leading-Edge Asynchronous Propeller Technology to test lift at low speeds. Read more.
1 min read
ED15-0137-59
The Hybrid-Electric Integrated Systems Testbed performs a full-power ground test at 224 kW of Leading-Edge Asynchronous Propeller Technology to test lift at low speeds. Read more.