Space Launch System GallerySpace Launch System GalleryThe Interim Cryogenic Propulsion Stage (ICPS) – for Artemis II arrived at the Space Coast on July 28, 2021. It...For the first three mission stages adapters help connect and protect the various parts of NASA’s Space Launch System rocket...Engines for early Artemis missions are being prepared for flight at Aerojet Rocketdyne’s facility at Stennis Space Center near Bay...Engineers at RUAG Space USA completed a test article for the development of the Space Launch System rocket universal stage...NASA has completed assembly of the upper, or forward, part of the core stage for the Space Launch System (SLS)...On launch day, the SLS Engineering Support Center team at NASA’s Marshall Space Flight Center in Huntsville, Alabama, will support...Team members in the Space Launch System (SLS) Engineering Support Center at NASA’s Marshall Space Flight Center in Huntsville, Alabama.The first four Artemis missions will use NASA’s 16 upgraded RS-25 engines that previously powered space shuttle flights. For future...NASA conducts a full-duration RS-25 hot fire test on the A-1 Test Stand at Stennis Space Center on Sept. 30....At NASA’s Michoud Assembly Facility in New Orleans, Orion’s newly completed pressure vessel for the Artemis III mission is lifted...The Interim Cryogenic Propulsion Stage for the second flight of NASA’s Space Launch System (SLS) rocket arrived in Florida on...The flight computer application software for NASA’s Artemis I mission is tested at the System Integration Lab at NASA’s Marshall...NASA conducted its sixth RS-25 single-engine hot fire Aug. 5 on the A-1 Test Stand at Stennis Space Center near...NASA conducted a fifth RS-25 single-engine hot fire July 14 as a continuation of its ongoing seven-part test series, supporting...Teams at NASA’s Marshall Space Flight Center in Huntsville, Alabama, recently completed welding the launch vehicle stage adapter for Artemis...Crews with NASA’s Exploration Ground Systems and contractor Jacobs stacked the launch vehicle stage adapter atop the core stage June...Teams with NASA’s Exploration Ground Systems and contractor Jacobs lower the Space Launch System (SLS) core stage – the largest...NASA’s Space Launch System (SLS) team fully stacked three hardware elements together May 24 to form the top of the...NASA conducted its fourth RS-25 single-engine hot fire test of the year on May 20, 2021, a continuation of its...Technicians at NASA’s Michoud Assembly Facility in New Orleans stacked two of three hardware elements for NASA’s Space Launch System...NASA conducted a long-duration RS-25 single-engine test April 28, continuing its seven-part test series to support development and production of...jsc2019e004066 (Feb. 20, 2019) --- At the Gagarin Cosmonaut Training Center in Star City, Russia, Expedition 59 crew member Nick...The first core stage of NASA’s Space Launch System (SLS) rocket departs Stennis Space Center near Bay St. Louis, Mississippi,...Crews at NASA’s Stennis Space Center near Bay St. Louis, Mississippi, worked April 19-20 to remove the first flight core...NASA conducted a second RS-25 single engine hot fire test April 6 as part of a new series to support...NASA’s Exploration Ground Systems team at the agency’s Kennedy Space Center in Florida has completed stacking the solid rocket boosters...Stacking is complete for the twin Space Launch System (SLS) solid rocket boosters for NASA’s Artemis I mission.Fully loading the propellant and detecting no leaks is a major milestone for the Green Run test series. A total...Fully loading the propellant and detecting no leaks is a major milestone for the Green Run test series. A total...Technicians are manufacturing NASA’s Space Launch System (SLS) core stage for the Artemis II lunar mission at NASA’s Michoud Assembly...Engineers are welding the core stage structures for the Artemis III mission, which will land the first woman and the...Eight rocket motor segments for the first flight of NASA’s Space Launch System (SLS) are lined up in preparation for...Space Launch System solid rocket boosters for the Artemis I missionThe first of 10 pieces of the twin Space Launch System (SLS) rocket boosters for NASA’s Artemis I mission was...Engineers at NASA’s Stennis Space Center near Bay St. Louis, Mississippi, completed a simulated launch countdown sequence on Oct. 5...Illustration of SLS rocket and Orion spacecraft on the mobile launcher for Artemis I.The NASA logotype, or "worm" logo, is seen on a booster on the side of NASA's Space Launch System, which...The NASA logotype, or "worm" logo, is seen on the interstage segment of the Space Launch System.The first solid rocket booster test for Space Launch System (SLS) missions beyond Artemis III seen here during a two-minute...The first solid rocket booster test for Space Launch System (SLS) missions beyond Artemis III seen here during a two-minute...