Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from December 8th 2023

View All Posts

    ISS Daily Summary Report – 12/08/2023

    Payloads: Aquamembrane-3: The Aquamembrane-3 Test run was initiated. A crewmember was present during the run to check the Water Processor Assembly (WPA) Sample Bags. After a maximum of 20 minutes of run, the experiment is terminated and equipment is stowed. The Testing Contaminant Rejection of Aquaporin Inside® Hollow-Fiber Forward Osmosis (HFFO) Module (Aquamembrane-3) investigation examines …

    Read Full Post