Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from November 2021

View All Posts

    ISS Daily Summary Report – 11/15/2021

    Orbital Debris Shelter-In-Place: The ISS team has been notified of a satellite breakup that may create sufficient debris to pose a conjunction threat to the ISS. As part of the nominal procedure for ISS conjunctions, this morning the crew closed all hatches and both Dragon and Soyuz crews sheltered in their respective vehicles. Out of …

    Read Full Post

    ISS Daily Summary Report – 11/12/2021

    Crew-3 Launch/Dock: On Wednesday, November 10th at 8:03 PM CST, the Crew-3 Dragon Endurance lifted off from Launch Pad 39A at Kennedy Space Center. Endurance then completed a 21-hour rendezvous and successfully docked to the ISS on Thursday, November 11th at 5:33 PM CST. The hatch to Dragon Endurance was opened at 7:25 PM and …

    Read Full Post

    ISS Daily Summary Report – 11/10/2021

    ISS Reboost: US tracking sources identified a debris conjunction of concern yesterday with a Time of Closest Approach (TCA) approximately forty-six minutes after Crew-3 docking. As a mitigation step, ground teams opted to implement a Predetermined Debris Avoidance Maneuver (PDAM) prior to Crew-3 launch. Earlier today, the conjunction was cleared but teams progressed with the …

    Read Full Post

    ISS Daily Summary Report – 11/09/2021

    Payloads:           ISS HAM:  A crewmember initiated an ISS HAM contact with South Yarra Primary School, South Yarra, Victoria, Australia.  ISS Ham Radio provides opportunities to engage and educate students, teachers, parents and other members of the community in science, technology, engineering and math by providing a means to communicate between astronauts and the ground HAM …

    Read Full Post

    ISS Daily Summary Report – 11/08/2021

    Endeavour Crew Undock/Landing: The Crew Dragon vehicle, Endeavour, carrying Thomas Pesquet, Shane Kimbrough, Megan McArthur, and Aki Hoshide undocked from the ISS today at 1:05 PM CT and will splash down later this evening. The completion of the 199-day Crew-2 mission marks the longest crewed capsule mission in US spaceflight history to-date and reduces the …

    Read Full Post

    ISS Daily Summary Report – 11/05/2021

    Payloads: Actiwatch Plus:  Crewmembers doffed the Actiwatch Plus and stowed it in the Actiwatch Plus Kit. The Actiwatch is a waterproof, nonintrusive, sleep-wake activity monitor worn on the wrist of a crewmember. The device contains a miniature uniaxial accelerometer that produces a signal as the subject moves. The data is stored in nonvolatile memory within …

    Read Full Post

    ISS Daily Summary Report – 11/04/2021

    Payloads: Sally Ride Earth Knowledge Acquired by Middle Schools (EarthKAM):  A crewmember performed a lens configuration to the 180mm lens on the EarthKAM camera. EarthKAM allows thousands of students to photograph and examine Earth from a space crew’s perspective. Using the Internet, the students control a special digital camera mounted on-board the ISS. This enables …

    Read Full Post

    ISS Daily Summary Report – 11/03/2021

    Payloads: ACME (Advanced Combustion via Microgravity Experiments):  A crewmember performed the second part of configuration for Flame Design part 2 by replacing two ACME controllers and setting the CIR Valve Timers to limit oxygen flow.  The ACME project is a set of six independent studies of gaseous flames to be conducted in the Combustion Integrated …

    Read Full Post

    ISS Daily Summary Report – 11/02/2021

    Payloads: Advanced Combustion via Microgravity Experiments (ACME):  A crewmember replaced the ACME Fiber Arm 1, Pressure Switch 2 with the ACME Pressure Switch Jumper, and replaced the ACME Igniter Tip 2.  This is in preparation of Flame Design part 2 operations.  The ACME project is a set of six independent studies of gaseous flames to …

    Read Full Post

    ISS Daily Summary Report – 11/01/2021

    Payloads: Exploration ECLSS-TOILET:  A crewmember completed a weekly survey on the Toilet System to provide feedback on system functionality and crew observations. The Toilet ЕДВ was also changed out and the crewmember checked the Toilet System for adequate Pretreat dosing from the Dose Pump.  The Toilet System is an Exploration Tech Demo that has evolved …

    Read Full Post