ISS Daily Summary Report – 7/22/2020
Payloads
Sally Ride Earth Knowledge Acquired by Middle Schools (EarthKAM): The crew performed the shutdown and stow of the EarthKAM hardware completing a 10 day mission. EarthKAM allows thousands of students to photograph and examine Earth from a space crew’s perspective. Using the Internet, the students control a special digital camera mounted on-board the ISS. This enables them to photograph the Earth’s coastlines, mountain ranges and other geographic items of interest from the unique vantage point of space. The EarthKAM team then posts these photographs on the Internet for viewing by the public and participating classrooms around the world.
Food Physiology: The crew performed saliva and fecal sample collections and blood collection setup in support of the Food Physiology study. The Integrated Impact of Diet on Human Immune Response, the Gut Microbiota, and Nutritional Status During Adaptation to Spaceflight (Food Physiology) experiment is designed to characterize the key effects of an enhanced spaceflight diet on immune function, the gut microbiome, and nutritional status indicators. These factors are interlinked, but diet is the only one that can be easily and meaningfully altered on Earth or during flight. This investigation aims to document the effect of dietary improvements on human physiology and the ability of those improvements to enhance adaptation to spaceflight.
Astrobee: The crew turned on the Astrobee flyers to allow the ground to perform free flyer operations for a mapping session of the Japanese Module. Astrobee is made up of three free-flying, cube-shaped robots which are designed to help scientists and engineers develop and test technologies for use in microgravity to assist astronauts with routine chores, and give ground controllers additional eyes and ears on the space station. The autonomous robots, powered by fans and vision-based navigation, perform crew monitoring, sampling, logistics management, and accommodate up to three investigations.
Systems
Post-Extravehicular Activity (EVA) Operations: Following yesterday’s EVA, the crew completed Post-EVA medical evaluations, airlock deconfiguration and a water recharge on Extravehicular Mobility Units (EMUs) 3004 and 3006. They also conducted an EVA debrief with ground specialists.
Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Water Recovery System (WRS) Sample Analysis & Data Record: Crew performed an analysis of the water processing assembly (WPA) using the TOCA. The TOCA unit oxidizes organic carbon species present in the water to carbon dioxide gas and measures the concentration using nondispersive infrared spectroscopy. Analysis of the potable water using the TOCA occurs on a weekly basis.
Treadmill (T2) Monthly Inspection: As part of regular maintenance to ensure the T2 exercise device is in good operational condition, the crew inspected all four snubber arms for any sign of free play as well as making any necessary adjustments to reduce the free play.
Mobile Servicing System (MSS) Operations: Ground robotic specialists (ROBO) performed a Space Station Remote Manipulator System (SSRMS)maneuver to stow the External Pallet (EP) on the Payload and ORU Accommodation (POA). Afterwards, ROBO performed a Mobile Transporter (MT) translation from worksite 1 (WS1) to worksite 5 (WS5) in preparation for the International Docking Adapter 3 (IDA3) survey tomorrow.
Completed Task List Activities:
- None
Today’s Ground Activities:
All activities are complete unless otherwise noted.
- Ground Support for MSS Operations
- UHF 2 Activation/Deactivation
- US/RS comm config to support activities in MRM
- Node 3 to Lab CDRA swap for Metox Regeneration
Look Ahead Plan
Thursday, 7/23 (GMT 205)
Payloads:
- HRF Saliva, Blood and Urine Collect (NASA)
- FIR/CDM Plate Changeout (NASA)
- Food Physiology MELFI Inserts and Hardware Stow (NASA)
- CBEF-L Config (JAXA)
- SAMS EE R&R (NASA)
Systems:
- EVA SAFER Test Module C/O
- Thermal Amine Swingbed Removal
- JEM Stowage Audit
- WPA Microbial Check Valve R&R
Friday, 7/24 (GMT 206)
Payloads:
- HRF Saliva and Urine Collect (NASA)
- FIR/CDM Plate Changeout (NASA)
- MSRR Z-book Battery (NASA)
- Astrobee Off (NASA)
- SPECTRUM Powerdown (NASA)
Systems:
- N2 PPA PFMC Removal
- EDR2 Launch Structure Removal
- EVA Loop Scrub
- EHS Benzene CMS Ops
- CMS Orthostatic Intolerance Garment (OIG) Fit Check
Saturday, 7/25 (GMT 207)
Payloads:
- HRF Saliva Collect (NASA)
Systems:
- Crew Off Duty
Today’s Planned Activities:
All activities are complete unless otherwise noted.
- HRF Generic Blood, Saliva & Urine Collection Ops
- ISS crew and ГОГУ (RSA Flight Control Management Team) weekly conference (S-band)
- UF-ATMOSFERA. PL Deactivation & Closeout Ops
- Waste and Hygiene Compartment (WHC) Manual Fill
- [СТТС] Configuration for MRM2
- Health Maintenance System (HMS) Periodic Health Status (PHS) Post EVA Examination
- ИДЭ-4 smoke sensor needle cleaning in MRM2 Fire Detection System
- Countermeasures System (CMS) Treadmill 2 System (T2) Monthly Inspection
- ISS HAM Radio Power Up
- Relocate PBAs following EVAs.
- Astrobee On
- Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Water Recovery System (WRS) Sample Analysis & Data Record
- Filling (separation) of ЕДВ-СВ or ЕДВ (КОВ) for Elektron-VM
- SCRAM Power Cycle
- AMS Laptop Power Cycle
- Crew Departure Preparations for Return to Earth
- Comm reconfig for nominal ops
- Video Recording of Greetings
- Photo/TV Extravehicular Activity (EVA) Camera Disassembly & GoPRO Stow
- EarthKAM Node 1 Shutdown, Disconnect, Stow (including items temp stowed for ops)
- Robotic Workstation (RWS) Teardown
- TERMINATOR. Removal from window and closeout ops with Terminator-Nadir PL
- MRM1 Fan Screen Cleaning (Group C)
- Pille dosimeter readings download
- Extravehicular Mobility Unit (EMU) Water Recharge
- Reading post-EVA Pille dosimeter data
- СКПФ1, СКПФ2 dust filter replacement and MRM1 Gas-Liquid Heat Exchanger (ГЖТ) cleaning
- BIOMAG-M. Setup and Activation of ТБУ-В No.4 at +29°С
- Food Physiology Fecal Sample Collection & MELFI Sample Insertion
- SpaceX/Flight Director Demo-2 Conference
- Crew Dragon Forward Monthly PCS Checkout
- CONSTANTA-2. Installation and activation of ТБУ-В No.07 at + 4°С
- Space Acceleration Measurement System Maintenance Work Area Preparation
- Extravehicular Activity (EVA) Airlock Deconfiguration
- PCS-DAS Teardown
- Metal Oxide (METOX) Regeneration Initiation
- INTERACTION-2. Experiment Ops
- USOS Window Shutter Close
- Visual inspection of ПН28-120 voltage converter (behind SM panel 231А)
- Extravehicular Activity (EVA) Debrief for US EVA