Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from March 2017

View All Posts

    ISS Daily Summary Report – 3/07/2017

    Energy Requirements for Long-Term Space Flight (Energy): The crew completed urine collections for Day 6 of the 11-day Energy protocol, logging food and drink consumptions as well.  The Energy investigation measures adaptations in the components of total energy expenditure of crewmembers so that an equation to determine the energy requirements of crewmembers during space flight …

    Read Full Post

    ISS Daily Summary Report – 3/06/2017

    Microgravity Expanded Stem Cells (MESC) Microscope Operations: Over the weekend the crew completed the MESC experiment, performing two days of back-to-back operations.  The crew viewed the BioCells on the microscope, then sampled and preserved the BioCells which were inserted into the Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI) for cold stowage.  The crew …

    Read Full Post

    ISS Daily Summary Report – 3/03/2017

    Fluid Shifts Dilution Measurements: The 48S subjects initiated their Return minus 45 (R-45) Fluid Shifts Dilution Measurements activities, beginning at wakeup the subject collected saliva, blood and urine and insert them into Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI) prior to ingesting a Sodium Bromide (NaBr) tracer. Throughout the day, the crew performed …

    Read Full Post

    ISS Daily Summary Report – 3/02/2017

    Lab Carbon Dioxide Removal Assembly (CDRA) Maintenance:  Yesterday the crew installed the newer generation beds, like those in Node 3 CDRA, into Lab CDRA. Today, the crew repaired the CDRA Valve Power Cable W9P12 by splicing in two new wire segments and performing a 120V power check of the connector prior to installing CDRA into …

    Read Full Post

    ISS Daily Summary Report – 3/01/2017

    Lab Carbon Dioxide Removal Assembly (CDRA) Maintenance:  Yesterday the crew removed Lab CDRA from the rack, and disassemble it by removing all of the valves and ducting to access the beds. They also removed the old beds. Today, the crew installed the newer generation beds, like those in Node 3 CDRA, mated Hydraflow Couplings, and …

    Read Full Post