Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from April 2016

View All Posts

    ISS Daily Summary Report – 04/14/16

    Cell Mechanosensing 3 (CMS-3) Operations: The crew successfully initiated and completed another microscope observation setting for CMS-3, after repositioning the thermal sample container to allow enough lighting through the microscope for imaging. The investigation identifies gravity sensors in skeletal muscle cells to develop countermeasures to muscle atrophy. Scientists believe that the lack of mechanical stress …

    Read Full Post

    ISS Daily Summary Report – 04/13/16

    SPHEROIDS De-installation: Following yesterday’s completion of the 2-day SPHEROIDS experiment run, Peake de-installed the SPHEROIDS experiment containers from Kubik 5 and transferred the containers into Minus Eight-degree Freezer for ISS (MELFI). The SPHEROIDS experiment investigates the effects of microgravity on endothelial cell function with respect to blood vessel formation, cellular proliferation, and programmed cell death. …

    Read Full Post

    ISS Daily Summary Report – 04/12/16

    SPHEROIDS Temperature and Power Check: The ESA SPHEROIDS experiment completed its two day experiment run. Yesterday, Peake retrieved the SPHEROIDS hardware from SpaceX-8 (SpX-8) and installed the containers into the Kubik. Today he will completed a temperature and power check. The experiment investigates the effects of microgravity on endothelial cell function with respect to blood …

    Read Full Post

    ISS Daily Summary Report – 04/11/16

    SpaceX (SpX)-8 Launch, Capture and Berth: SpX-8 launched successfully at 3:43 PM CDT Friday. Capture and berthing to the Node 2 nadir port occurred on Sunday at 6:24 AM CDT, and berthing occurred approximately 3 hours later. This morning, the USOS crew ingressed the Dragon and began transferring Cargo Transfer Bags (CTBs), unpacking Double Cold …

    Read Full Post

    ISS Daily Summary Report – 04/8/16

    SpaceX-8 launch:  SpaceX-8’s Dragon capsule was successfully launched from Cape Canaveral, Florida at 3:43 PM Central time.  Solar arrays have been deployed.  Capture and berthing are planned for Sunday, April 10.

    Read Full Post

    ISS Daily Summary Report – 04/7/16

    Meteor Troubleshooting and Camera Installation:  Williams performed troubleshooting on the Meteor payload software issues that were experienced yesterday, but the troubleshooting was unsuccessful.  He then began installing the hardware into the Window Observational Research Facility (WORF).  The hardware installation was partially completed, with the camera and the WORF hatch remaining to be installed. Meteor’s first …

    Read Full Post

    ISS Daily Summary Report – 04/5/16

    Muscle Atrophy Research and Exercise System (MARES): Peake completed partial checkout activities for the MARES investigation by placing Percutaneous Electrical Muscle Stimulator (PEMS) electrodes on the designated area of the right leg and successfully executing ankle exercise sessions.  Software issues were discovered which prevented the remaining activities from being completed.  These will be rescheduled for …

    Read Full Post

    ISS Daily Summary Report – 04/4/16

    63 Progress (63P) Docking: 63P docked successfully to the Service Module (SM) Aft docking port on Saturday. Capture occurred at 12:57 PM CDT with hook closure at 1:03 PM CDT.   Japan Aerospace Exploration Agency (JAXA) Protein Crystal Growth (PCG) Installation: On Sunday, Peake installed 2 canisters containing 38 protein samples into the PCRF to …

    Read Full Post

    ISS Daily Summary Report – 04/1/16

    Strata-1 Payload Activation: Earlier this morning Peake moved the Space Acceleration Measurement System (SAMS) sensor enclosure from the Japanese Experiment Module (JEM) to the Strata-1 payload for activation and checkout activities. When Peak switched the main power switch on, an overcurrent trip occurred on the Solid State Power Control Module (SSPCM) channel for Express Rack …

    Read Full Post