Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

ISS Daily Summary Report – 06/12/15

Integrated Resistance and Aerobic Training Study (Sprint) Volume of Oxygen Utilized (VO2) Exercise Session: Kelly performed his Flight Day (FD) 75 Sprint exercise session on the Cycle Ergometer with Vibration Isolation and Stabilization (CEVIS). He donned Electrocardiogram (ECG) electrodes, Heart Rate Monitor (HRM) hardware, and Portable Pulmonary Function System (PPFS) calibrations then executed the VO2 protocol. The Sprint investigation evaluates the use of high intensity, low volume exercise training to minimize loss of muscle, bone, and cardiovascular function in ISS crewmembers during long-duration missions. Upon completion of this study, investigators expect to provide an integrated resistance and aerobic exercise training protocol to maintain muscle, bone and cardiovascular health while reducing total exercise time over the course of a long-duration space flight. This will provide valuable information in support of investigator’s long term goal of protecting human fitness for even longer space exploration missions.

Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI) Ice Brick Insertion: Kelly inserted Ice Bricks into MELFI for conditioning prior to SpaceX-7 arrival per the cold/conditioned stowage plan.

Radiation Dosimetry Inside ISS-Neutrons (RADI-N): Kelly received the RADI-N detectors from Kornienko and deployed them in the eight predetermined locations throughout the ISS. This investigation is to better characterize the ISS neutron environment and define the risk posed to the crewmembers’ health and provide the data necessary to develop advanced protective measures for future space flight. For each session 8 detectors are initialized and deployed in predetermined locations for measurements: a set of 6 spectrometric detectors and two control ones are placed on a wall of a ISS Segment; After 7 days the detectors are collected and read using the BUBBLE reader.

Water Recovery System (WRS) Recycle Tank Remove & Replace (R&R): Kelly performed this regularly scheduled maintenance to R&R the WRS recycle tank.

Today’s Planned Activities
All activities were completed unless otherwise noted.

  • BAR. Experiment Ops. / r/g 9072
  • Replacement of ИДЭ-3 Smoke Detector in DC1 / r/g 9071
  • ECLSS Recycle Tank Remove and Replace
  • ISS HAM Radio Power Up
  • SPRINT – Hardware Power On
  • WRS – Recycle Tank Fill
  • MATRYOSHKA-R. Gather and Initialize BUBBLE-dosimeter detectors. / r/g 9070
  • SSC 5 and 6 – Reboot
  • MATRYOSHKA-R. Handover of BUBBLE-dosimeters to USOS / r/g 9070
  • RADIN – Handover of Bubble-Detectors
  • MATRYOSHKA-R. BUBBLE-dosimeter initialization and deployment. / r/g 9070
  • RADIN – Dosimeter Deployment
  • WRS – Recycle Tank Fill
  • SPRINT Experiment Ops
  • URAGAN. VSS PL R&R and Test Activation r/g 9074
  • Set up Node 1 and JEM camcorders for HD downlink of the screens of SSC 4 and SSC 15
  • WRS – Recycle Tank Fill
  • SPRINT-PPFS – Partial Stow
  • Video Footage of Greetings / r/g 9077
  • MERLIN 3 Desiccant Swap
  • RGN – Start Water Transfer to EDV
  • IDENTIFIKATSIYA. Copy ИМУ-Ц micro-accelerometer data to laptop / r/g 8732
  • SM Ventilation System Preventive Maintenance. r/g 8393
  • RGN REC-TNK – Removal of depress hose for nominal operations
  • RGN – End Water Transfer to EDV
  • WRS – Recycle Tank Fill
  • MELF3. Ice Brick Insertion into Dewar
  • IMS and Stowage Conference
  • SPRINT – Closeout Ops
  • IMS Delta File Prep
  • URAGAN Observations and Photography / r/g 9069

Completed Task List Items

  • None

Ground Activities
All activities were completed unless otherwise noted.

  • Sprint VO2 ops
  • BCDU1A1 Reconditioning

Three-Day Look Ahead:

  • Saturday, 06/13: Crew off duty, housekeeping
  • Sunday, 06/14: Crew off duty
  • Monday, 06/15: JEMAL ST retraction, Fine Motor Skills, METERON laptop install/activation

QUICK ISS Status – Environmental Control Group:

Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

Off

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

On

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Shutdown

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Standby

Urine Processing Assembly (UPA)

Process

Trace Contaminant Control System (TCCS) Lab

Off

Trace Contaminant Control System (TCCS) Node 3

Full Up