ISS Daily Summary Report – 02/09/15
SpaceX-5 Departure Preparations: The crew performed final cargo loading today. Once loading was complete, they closed the Dragon hatch and configured the Node 2 vestibule including installation of the Common Berthing Mechanism (CBM) Controller Panel Assemblies (CPAs). SpaceX-5 unberth activities are scheduled to start tomorrow morning at ~10:20am CST with the crew releasing Dragon at ~1:10pm CST, utilizing the Space Station Remote Manipulator System (SSRMS).
Japanese Experiment Module Airlock (JEMAL): Following last week’s cubesat deployment, Wilmore worked with ground teams to configure the JEMAL for pressurization and leak checks today. The JEM Small Satellite Orbital Deployer (SSOD) and Multi-Purpose Experiment Platform (MPEP) will be removed from the JEMAL slide table later this week.
Double cold bag pack: Virts and Cristoforetti reviewed reference materials and procedures, then transferred samples and the required ice bricks from ISS cold stowage to six double cold bags in preparation for SpaceX-5 departure tomorrow.
Extravehicular Mobility Unit (EMU) 3011 Fan Pump Separator (FPS) Status: Over the weekend, the crew removed the FPS from EMU 3011 and packed it for return on SpaceX-5. During recent maintenance activities, the FPS had failed to operate.
Advanced Resistive Exercise Device (ARED) Right Upper Stop Cable Status: The right upper stop cable for ARED failed over the weekend and has been replaced with a pristine spare. The cable that failed over the weekend is the degraded cable which was installed last Thursday. The newly failed unit was subsequently packed for return onboard SpaceX-5.
Today’s Planned Activities
All activities were completed unless otherwise noted.
- Double Cold Bag (DCB) Packing
- JEMAL – Pressurization
- VIRU. Battery Charge
- MRM2 comm config to support voice comm for the experiment
- Kulonovskiy Kristall Experiment Run
- Double Cold Bag (DCB) Packing for Return
- Install LTA Restraint Bag on EMU 3011
- PROBOY
- EMU replacement for EVA and tool config
- MRM2 Comm Reconfig for Nominal Ops
- JEMAL – Leak check
- KULONOVSKYI KRISTALL. Copy and Downlink Data
- Video shooting for Channel 1
- Auxiliary Laptop Anti-Virus Update
- VIZIR. Experiment Ops
- BCAT Camera Checkout
- Dragon Final & Center Stack Transfers
- MRM1 Fan Screen Cleaning (group B). Vacuum Cleaning area behind panels 405, 406.
- Verification of ИП-1 Flow Sensor Position
- Download Pille Dosimeter Readings
- MPEG-2 Video Downlink Test via Ku-band prior to Progress 425 docking to the ISS
- Dragon Cargo Operations Conference
- VIRU. Software Update
- Video shooting for Channel
- Toilet [АСУ] Inserts Audit
- Dragon – Rendezvous and Prox Ops Program (RPOP) Review
- Dragon – Egress, Hatch Closure, & Install tape over seal between Dragon hatch and bulkhead
- VIRU. Hardware Setup for Relaksatsiya Experiment
- Node 2 Nadir CBM Controller Panel Assembly (CPA) Installation
- VIRU. Hardware parameter adjustment for Relaksatsiya Experiment
- ATV – BUC Setup (Break-Up Camera)
- VIRU. Earch Observation Relaksatsiya Experiment
- SM АСП-О cover sealing mechanism maintenance
- VIRU. Closeout Ops and Hardware Teardown after Relaksatsiya Experiment
- ATV5 Closeout Photos
- Exercise data downlink
- VIRU. Fill out and Downlink VIRU Log Sheet
- RELAKSATSIYA. Relaksatsiya P/L Battery Charge
Completed Task List Items
- ATV Cargo Ops [In work]
- ARED upper stop cable parts 1 & 2
Ground Activities
All activities were completed unless otherwise noted.
- JEMAL Pressurization Monitoring
- MPEG-2 Video Downlink Test in preparation for ATV-5 undock.
Three-Day Look Ahead:
- Tuesday, 02/10: Regen ECLSS Recycle Tank R&R, Aniso Tubule Observation, EVA Tool Config, Dragon Demate and Release
- Wednesday, 02/11: HMS Vision Test, ARED Grip Tape Install, BP Reg hardware Installl, Force Shoes ARED Ops, EVA Tool Prep, EMU Fit Check, Bone Densitometer, Plant Rotation Sample Prep
- Thursday, 02/12: BP Reg Ops, OCT, ATV Cargo Ops, JSSOD MPEP Removal, Frost Ice Pack Install, HMS Fundoscope
QUICK ISS Status – Environmental Control Group:
Component | Status |
Elektron | On |
Vozdukh | On |
[СКВ] 1 – SM Air Conditioner System (“SKV1”) | On |
[СКВ] 2 – SM Air Conditioner System (“SKV2”) | Off |
Carbon Dioxide Removal Assembly (CDRA) Lab | Standby |
Carbon Dioxide Removal Assembly (CDRA) Node 3 | Operate |
Major Constituent Analyzer (MCA) Lab | Idle |
Major Constituent Analyzer (MCA) Node 3 | Operate |
Oxygen Generation Assembly (OGA) | Standby |
Urine Processing Assembly (UPA) | Standby |
Trace Contaminant Control System (TCCS) Lab | Off |
Trace Contaminant Control System (TCCS) Node 3 | Full up |