Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from July 2014

View All Posts

    ISS Daily Summary Report – 07/03/14

    Burning and Suppression of Solids (BASS)-II Operations: Flight Engineer (FE)-5 Wiseman conducted flame tests for the BASS-II investigation which examines the burning and extinction characteristics of a wide variety of fuel samples in microgravity. The experiment will guide strategies for materials flammability screening for use in spacecraft as well as provide valuable data on solid …

    Read Full Post

    ISS Daily Summary Report – 07/02/14

    FLame Extinguishment Experiment (FLEX)-2 Operations: Flight Engineer (FE)-5 Wiseman removed the Combustion Integration Rack (CIR) alignment guides which isolate the rack and allow ground teams to conduct another FLEX-2 test point via ground commanding. Iso-octane was used for this test point. FLEX-2 uses small droplets of fuel to study the special burning characteristics of fire …

    Read Full Post

    ISS Daily Summary Report – 07/01/14

    Circadian Rhythms: FE-6 Gerst donned the Circadian Rhythms hardware to start a 36 hour data take. The main objective of the experiment is to get a better basic understanding of any alterations in circadian rhythms in humans during long-term space flights. This data will provide important insights into the adaptations of the human autonomic nervous …

    Read Full Post