ISS Daily Summary Report – 03/13/14
SpaceX-3 Launch Delayed: Due to contamination found on the beta cloth shields in the SpaceX-3 unpressurized external trunk, the decision was made to move the launch of SpX-3 to later in the month. The exact day of launch will be assessed by ground teams. Specialists are reviewing options for addressing the contamination issue on the beta cloth shields.
Environmental Health System (EHS) – Sound Level Meter (SLM) Setup and Operations: Earlier this morning Commander (CDR) Wakata set up the SLM to perform acoustic measurements of the ISS. This is a routine activity to measure the acoustic environment in the habitable areas. Data is transferred to a Station Support Computer (SSC) for downlink to the ground for assessment.
Dragon On Board Training (OBT) Offset Grapple: In preparation for SpX-3 berthing, Wakata and Flight Engineer (FE)-5 Mastracchio performed this OBT in the Cupola followed by a conference with ground teams. The crew members practiced several grapple approaches. Following the activity, the crew disassembled the Robotics Work Station (RWS).
Treadmill 2 (T2) 6-Month Inspection: This morning Mastracchio completed this routine maintenance on the T2. He cleaned the closeout panels, greased forward and rear axles, inspected treadmill motor carriage bolts and belts.
Today’s Planned Tasks
- Laptop RS1(2) Reboot / Onboard Computer System [Complete]
- RSS1,2 Reboot / r/g 1009 [Complete]
- Daily Planning Conference (S-band)
- Acoustic Dosimeters: hardware setup for static measurements [Complete]
- URAGAN. Photo Spectrum System Battery Charge (start) / r/g 3620 [Complete]
- ISERV – Window Shutter Open [Complete]
- T2 Semi-Annual Maintenance [Complete]
- Locating Equipment to Replace ЦВМ (А1) / r/g 5085 [Complete]
- OBSTANOVKA. Download of Obstanovka P/L Data from БСПН to RSS1 (start) / r/g 5087 [Complete]
- Water Transfer from Progress 422 Water Tank БВ2 to EDV and Progress 422 Water Tank БВ2 Shell r/g 5084 [Complete]
- SSRMS Checkout [Complete]
- PAO Hardware Setup [Complete]
- Crew Prep For PAO [Complete]
- PAO Event [Complete]
- SLM data transfer [Complete]
- T2 Activation and Checkout Video Setup [Complete]
- T2 – Activation and Functional Check [Complete]
- Treadmill 2 (T2) Activation and Checkout (ACO) Video Teardown [Complete]
- URAGAN. Observation and Photography using Photo Spectrum System / r/g 5088 [Complete]
- PAO Hardware Setup [Complete]
- Crew Prep for PAO [Complete]
- On MCC GO Filling up ТГК 422 (DC1) СрПК Section 2 with N2, [Complete]
- PAO Event [Complete]
- Preparation for ЦВМ(А1) Replacement. r/g 5085 [Complete]
- OBT Dragon Offset Grapple No. 2 [Complete]
- On MCC GO Demating ЦВМ (А1) J-4 connector. r/g 5085 [Complete]
- ЦВМ (А1) R&R. Tagup with specialists / r/g 5085 [Complete]
- On MCC GO Mating ЦВМ (А1) J-4 connector. r/g 5085 [Complete]
- ЦВМ (А1) R&R Closeout. Tagup with specialists / r/g 5085 [Complete]
- OBSTANOVKA. Download of Obstanovka P/L Data from БСПН to RSS1 (end) / r/g 5087 [Complete]
- Installation of (portable broadcast) ССД 307 light in SM. r/g 5086 [Complete]
- OBT – ROBoT HTV Debrief Conference [Complete]
- SLM data transfer [Complete]
- Screw Clamp Tightening on MRM1 side [Complete]
- HAM Radio Session [Complete]
- IMS and Stowage Conference [Complete]
- Rodnik Water Tank 2 bladder compression in ТКГ 422 – Close-out ops r/g 5084 [Complete]
- SSRMS Checkout [Complete]
- Daily Planning Conference (S-band) [Complete]
- ГФИ-1. Relaksatsiya P/L Battery Charge / r/g 4157 [Complete]
- REACTION – Self-reaction test [Complete]
Task List
- ARED Cylinder Evac [Complete]
- IMS Edit
- WHC EDV-Y R&R
- WHC KTO replace
- EKON-M. Observations and photography
- AC Vacuum Bag R&R
- RGN WSTA Fill [Complete]
- FSL FASES Bypass [Complete]
- Dragon ROBoT self study [In work]
- CFE – ICF1 OPS Parts 1,2,3
- EMU SLE Deltas Training
- CFE ICF1 Ops Pt, 1, 2, 3
- CSA CP Battery Check [Complete]
- Hatch Seal Inspection Pt. 2 [Complete]
- EVA SCOF cycle [Complete]
- NOD1S4 Rack Labels [Complete]
- WHC SW Rec R&R
Ground
- Nominal Commanding [Complete]
- SSRMS Checkout [Complete]
Three-Day Look Ahead:
- Friday, 03/14: NATGEO Event #1, CIR needle R&R
- Saturday, 03/15: Crew off duty
- Sunday, 03/16: Crew off duty, NATGEO Event #2
QUICK ISS Status – Environmental Control Group:
Component | Status |
Elektron | Off |
Vozdukh | Manual |
[СКВ] 1 – SM Air Conditioner System (“SKV1”) | Off |
[СКВ] 2 – SM Air Conditioner System (“SKV2”) | Off |
Carbon Dioxide Removal Assembly (CDRA) Lab | Operate |
Carbon Dioxide Removal Assembly (CDRA) Node 3 | Standby |
Major Constituent Analyzer (MCA) Lab | Off |
Major Constituent Analyzer (MCA) Node 3 | Operate |
Oxygen Generation Assembly (OGA) | Operate |
Urine Processing Assembly (UPA) | Norm |
Trace Contaminant Control System (TCCS) Lab | Off |
Trace Contaminant Control System (TCCS) Node 3 | Full up |