ISS Daily Summary Report – 01/08/14
USOS Crew Off Duty: The USOS Crew was scheduled for an off duty day today and again tomorrow in preparation for upcoming Cygnus operations this weekend.
Orbital 1 Status: The first X-Class solar flare of 2014 occurred yesterday, January 7th. As a result, Orbital Sciences has decided to delay their Antares launch to no earlier than January 9th 1210pm CST. High levels of space radiation is forecasted, which exceed margins imposed on the mission. Cygnus berthing remains scheduled for January 12th with ingress the following day. An updated space weather forecast is expected later this afternoon.
S1 Lower Outboard Camera (S1LOOB): Overnight, video from the S1LOOB camera degraded to the point where video was lost. Initial attempts by the flight control team to manipulate the camera were unsuccessful. The team subsequently power cycled the camera four times in order to recover most of the camera’s functionality. The automatic iris control capability was not recovered and required manual control. The camera is now pre-positioned to support upcoming Cygnus operations. It is one of four possible cameras needed to monitor Cygnus’s trajectory during final approach.
Fluids Integrated Rack (FIR) Loss of Communication Troubleshooting: Troubleshooting was performed today for the FIR Fluid Science Avionics Processor (FSAP) communication issue. After copying application files to the secondary hard drive, Ground Controllers were able to reconfigure the internal software to boot from the secondary drive. Communication between the FSAP and the Input-Output Processor (IOP) was reestablished on the secondary drive. Ground teams then completed a check disk scan of the hard drive which did not show any issues. A review of the application and log files did not show any evidence of corruption in any of the files. Another attempt to reboot the FSAP from the primary hard drive was performed, however but this time the FSAP booted nominally and was able to establish nominal communication with the IOP and with the Light Microscopy Module (LMM) science package. All indications showed the primary hard drive is operating nominally.
Today’s Planned Tasks
- Morning Inspection. SM ПСС (Caution & Warning Panel) Test [Complete]
- ALBEDO. Battery Charge (start) [Complete]
- Replacement of СД1-7 Lights with ССД305 Lights in FGB [Complete]
- MATRYOSHKA-R. Monitoring Lulin-5 readings [Complete]
- MATRYOSHKA-R. Monitoring Tritel Readings [Complete]
- Replacement of Purification Column Units (БКО) with БКО No. 1204058 for Elektron SVO. Dispose of the dismantled unit via ТКГ 420 [Complete]
- Replacement of 3 СД 1-7 failed lights in MRM1. Tagup with specialists as necessary (S-band)
- СОЖ Maintenance [Complete]
- EHS MCD Water Processing [Complete]
- HAM Radio Session [Complete]
- Cleaning ISS RS Habitation Area Interior Panels [Complete]
- TERMO-LADA. Visual Inspection of Hardware Operation [Complete]
- Network and Computer Hardware Audit [Complete]
- ТКГ 420 Transfers and IMS Ops [Complete]
- Formaldehyde Monitoring Kit (FMK) Stow Operations [Complete]
- WHC EDV Prep [Complete]
- Monitoring Regul-OS Antenna Feeder cable connection to Regul-OS СА-316-1, 2 Position Finder [Complete]
- RGN REC-TNK – Remove depress hose for nominal operations [Complete]
- ИП-1 Flow Sensor Position Check [Complete]
- ALBEDO. Experiment with the use of Photo Spectrum System (ФСС) [Complete]
- IMS Update [Complete]
- АОК ГАНК-4М data readout [Complete]
- Cleaning ISS RS Habitation Area Interior Panels [Complete]
- MRM2 comm config to support voice comm during experiment [Complete]
- Kulonovskiy Kristall Experiment. Tagup with specialists (S-band) [Complete]
- SODF Pen and Ink [Complete]
- MRM2 Comm Reconfig [Complete]
- KULONOVSKIY KRISTALL. File Preparation and Downlink [Complete]
- Journal Entry [Complete]
- URISIS Hardware Setup [Complete]
- HAM Radio Session [Complete]
Task List
- ARED Cylinder Evac
- IMS Edit
- Replace KTO
- ЕДВ-У R&R
- Preparation of reports for Roskosmos site
- URAGAN. Observation and photography
- EKON-M. Observations and photography
- G1 camcorder troubleshooting [Complete]
- National Engineers Week Message
- National Geographics B Roll Part 4
Ground
- Nominal Commanding [Complete]
Three-Day Look Ahead:
- Wednesday, 01/08: Orb-1 Launch, USOS crew off duty prior to upcoming Orb-1 operations
- Thursday, 01/09: USOS crew off duty prior to upcoming Orb1 Ops
- Friday, 01/10: ARED Screw tightening, FASES Harness Inspection, ProK, CFE-Vane Gap 2
QUICK ISS Status – Environmental Control Group:
Component | Status |
Elektron | Off |
Vozdukh | Manual |
[СКВ] 1 – SM Air Conditioner System (“SKV1”) | On |
[СКВ] 2 – SM Air Conditioner System (“SKV2”) | Off |
Carbon Dioxide Removal Assembly (CDRA) Lab | Standby |
Carbon Dioxide Removal Assembly (CDRA) Node 3 | Operate |
Major Constituent Analyzer (MCA) Lab | Off |
Major Constituent Analyzer (MCA) Node 3 | Operate |
Oxygen Generation Assembly (OGA) | Process |
Urine Processing Assembly (UPA) | Standby |
Trace Contaminant Control System (TCCS) Lab | Off |
Trace Contaminant Control System (TCCS) Node 3 | Full up |