ISS Daily Summary Report – 11/08/13
Soyuz Motion Control Test: Commander (CDR) Yurchikhin and Flight Engineer (FE)-5 Parmitano successfully conducted a Soyuz 35S Motion Control System Test. The test was performed in preparation for their upcoming undocking on Sunday, November 10th at 5:26pm (CST)
Japanese Experiment Module (JEM) Wireless Access Point (WAP) Installation: FE-3 Hopkins and FE-6 Nyberg completed installation of the JEM WAP in support of the Freezer-Refrigerator Of STirling cycle (FROST) payload activation.
US Segment Crew Handover: Nyberg and Parmitano conducted a handoverwith newly arrived crewmembers FE-8 Mastracchio and FE-9 Wakata. Topics included recommendations for on-orbit practices, lessons learned, and familiarization of ISS Systems and Payloads within each USOS module.
Biolab Microscope Cassette Installation: Biolab Microscope Cassette Installation: Parmitano installed the Microscope Cassette in the Biolab Microscope. This was in preparation for additional testing prior to Biolab commissioning planned for later this month. The Biolab is a multiuser research facility located in ESA’s Columbus laboratory, used to perform space biology experiments on microorganisms, cells, tissue cultures, small plants, and small invertebrates. Biolab will allow scientists to gain a better understanding of the effects of microgravity and space radiation on biological organisms.
Environmental Health System (EHS) – Microbial Capture Device (MCD) and Coliform Water Sample Analysis: Hopkins visually analyzed coliform detection bags and microbial capture devices following 48 hours of incubation. This is regularly scheduled testing in order to characterize onboard water quality.
Today’s Planned Tasks
- HRF Saliva Sample Collection [Complete]
- USOS Window Shutter Close [Complete]
- HRF – MELFI Sample Insertion [Complete]
- ТК 709 Motion Control System (СУД) Test Prior To Undocking [Complete]
- ТК 711 Transfers and IMS Ops [Complete]
- Bringing ODF up to date using ТК 711 delivered files [Complete]
- D2XS Battery Charge [Complete]
- ТК 709 АСУ Activation / Ascent and Descent [Complete]
- Review Airlock Ops Procedure per RODF “EVA from DC1 [Complete]
- JEM – Wireless Access Point (WAP1) Installation [Complete]
- ПФ1, ПФ2 Dust Filter Replacement and В1, В2 Fan Grille Cleaning in DC1 [Complete]
- HMS – Stow for return or discard personal and medical items prior to return to Earth [Complete]
- JEM – Wireless Access Point (WAP1) Installation – Assistance [Complete]
- LBNP Exercise (FINAL). Tagup with specialists (S-band) [Complete]
- Photo/TV Camcorder Setup Verification [Complete]
- HAM Radio Power Up [Complete]
- Photography of traces left by the Active Docking Mechanism Probe on the MRM1 Passive Mechanism [Complete]
- Receiving Cone [Complete]
- Food Frequency Questionnaire [Complete]
- JEM – Wireless Access Point (WAP1) Installation – Assistance [Complete]
- Downlink photo imagery of the Docking Cone internal surface via OCA [Complete]
- Handover [Complete]
- Crew Departure Prep [Complete]
- Removal of two КЛ-152М TV cameras and light units from ТК 711 [СА].Stow TV cameras [Complete]
- Stow Video Equipment Used for ARED Exercise Video [Complete]
- Symbolic Activity. Activity with “Olympic Torch” certificates and “SOCHI 2014” envelopes [Complete]
- Symbolic Activity. Activity with “Torch” Certificates [Complete]
- Symbolic Activity. Activity with “Torch” Certificates [Complete]
- Preparation of Incomplete Fuel Combustion Product [ПНСТ] Protection Kit [Complete]
- Simbolic Activity with “SOCHI 2014” envelopes delivered on ТПК 710 [Complete]
- Microbial Sample Collection (Kit 2 Sampling) [Complete]
- EM – Wireless Access Point (WAP1) Installation – Checkout and Closeout Ops [Complete]
- JRNL – Log Entry [Complete]
- JEM – Activation of FROST Freezer-Refrigerator [Complete]
- Refill and Install Drink Bag in Orlan-MK [Complete]
- SHD – Weekly Questionnaire [Complete]
- ISERV – Opening window shutters in the LAB [Complete]
- Daily Questionnaire [Complete]
- CEVIS – Connect to USB [Complete]
- PAO Hardware Setup [Complete]
- Food Frequency Questionnaire [Complete]
- Crew Prep for PAO [Complete]
- PAO Event (Joint Press Conference) [Complete]
- EVA Timeline Update. Tagup with specialists (S-band) [Complete]
- EVA timeline update. Nikon D3 Camera Setup for EVA [Complete]
- HRF Blood Collection Hardware Setup [Complete]
- Handover [Complete]
- EHS MCD Water Processing [Complete]
- D2XS Battery Charge [Complete]
- Photo and Video of CDR running with the Olympic Torch [Complete]
- Replacing PILLE flash card [Complete]
- CEVIS – Connect to USB [Complete]
- BLB – Cassette Installation [Complete]
- Download Pille Dosimeter Readings [Complete]
- Crew Departure Prep [Complete]
- Glisser-M Equipment Setup for EVA-36 Video Ops [Complete]
- Preparation of the Olympic Torch for EVA [Complete]
- Private Medical Conference [Complete]
- BAKTERIOFAG. Photo imagery during case removal from panel 328 [Complete]
- Glisser-M Equipment Setup for EVA-36 Video Ops. [Complete]
- SHD – Weekly Questionnaire [Complete]
- Crew time for ISS adaptation and orientation
- BAKTERIOFAG. Removal and Transfer of BIOECOLOGIYA Case to TK [Complete]
- Crew time for ISS adaptation and orientation [Complete]
- BIORISK. Removal from SM and Transfer to ТК [Complete]
- СОЖ Maintenance [Complete]
- Preparation of Cables for SSC Connection in MRM2 for EVA [Complete]
- Transfers for ТК 711 [Complete]
- Signing ISS RS Handover Protocol [Complete]
- Pille sensors prep for EVA [Complete]
- IMS and Stowage Conference [Complete]
- SHD – Weekly Questionnaire [Complete]
Task List
- ARED Cylinder Evacuation
- ЕДВ-У R&R
- KTO Replace
- 35S Prepack [In Work]
- 37S Unpack [In Work]
- Crew Departure Prep FE-5, FE6 [Complete]
- Data Prep Return CDR
- Data Prep Return FE-5, FE-6 [In Work]
- Windows on Earth Photos
- Cygnus Pregather [In Work]
- D2X Camera Sensor Cleaning
- JSL NOD1 Switch Deploy
Ground
- Nominal Commanding [Complete]
Three-Day Look Ahead:
- Saturday, 11/09: RS EVA 36
- Sunday, 11/10: Change of Command, US Tool Transfer, 35S pack/stow, 35S undock/landing
- Monday, 11/11: Crew off duty
QUICK ISS Status – Environmental Control Group:
Component | Status |
Elektron | On |
Vozdukh | Manual |
[СКВ] 1 – SM Air Conditioner System (“SKV1”) | On |
[СКВ] 2 – SM Air Conditioner System (“SKV2”) | Off |
Carbon Dioxide Removal Assembly (CDRA) Lab | Standby |
Carbon Dioxide Removal Assembly (CDRA) Node 3 | Operate |
Major Constituent Analyzer (MCA) Lab | Off |
Major Constituent Analyzer (MCA) Node 3 | Operate |
Oxygen Generation Assembly (OGA) | Process |
Urine Processing Assembly (UPA) | Standby |
Trace Contaminant Control System (TCCS) Lab | Off |
Trace Contaminant Control System (TCCS) Node 3 | Full up |