Suggested Searches

Blogs

    ISS Daily Summary Report – 10/02/13

    Reconfiguration of the Combustion Integrated Rack (CIR) for the Multi-user Droplet Combustion Apparatus (MDCA) Flame Extinguishment (FLEX)-2 Experiment:  Today Flight Engineer (FE)-6 Nyberg reconfigured and replaced hardware in the MDCA to support operation of the FLEX-2 experiment.  FLEX-2 is the second experiment on the ISS which uses small droplets of fuel to study the special …

    Read Full Post

    ISS Daily Summary Report – 10/01/13

    ENERGY (Astronaut’s Energy Requirements for Long-Term Space Flight):  Flight Engineer (FE)-5 Parmitano began his diet protocol for a 10 day session of ESA’s ENERGY experiment.  He also positioned an armband monitor on his right triceps, where it will be worn for the entire 10 day period.  A loss in astronauts’ body mass is a common …

    Read Full Post

    Shutdown Notice

    We’re sorry, but we will not be posting updates to this blog during the government shutdown. Also, all public NASA activities and events are cancelled or postponed until further notice. Rest assured that we will be back as soon as possible! We hope that you will stick with us and we promise more great imagery […]

    Read Full Post

    ISS Daily Summary Report – 09/30/13

    Cygnus Status:  Following the completion of the Node 2 Vestibule outfitting activities yesterday, Flight Engineer (FE)-5 Parmitano and FE-6 Nyberg opened the Cygnus Hatch at 03:10am CDT today. The crew has since ingressed, photo documented cargo configuration, and started cargo transfer operations. Emergency Procedure Review:  All six crewmembers took part in an onboard training session …

    Read Full Post

    ISS Daily Summary Report – 09/29/13

    Cygnus Rendezvous, Capture, and Berth: On Saturday, Cygnus successfully completed an early Relative Global Positioning System (RGPS) PROX checkout and demonstrated the vehicle’s ability to rely on RGPS for targeting of the coelliptic transfer and approach initiation maneuvers.   Phasing burns ADV1-3 were all completed nominally enabling successful demonstration of the Autonomous REA Maneuver objective, which …

    Read Full Post

    Key Science Points from the 2013 IPCC Report

    These key science points were published on September 27, 2013, as “headline statements” by the Intergovernmental Panel on Climate Change (IPCC) as part of the organization’s fifth assessment report. Background links provided by Earth Observatory. +Warming of the climate system is unequivocal, and since the 1950s, many of the observed changes are unprecedented over decades […]

    Read Full Post

    ISS Daily Summary Report – 09/25/13

    Soyuz (36S): Launch and Docking: Flight Engineer (FE)-1 Kotov, FE-2 Ryazanskiy, and FE-3 Hopkins launched on 36S from the Baikonur, Kazahkstan Cosmodrome at 3:58pm CDT, 25 September.  36S performed a nominal four-orbit rendezvous then docked to the Mini-Research Module (MRM)-2 port at 9:45pm CDT, returning the ISS to a full 6-crew complement.  Following hatch opening …

    Read Full Post

    ISS Daily Summary Report – 09/24/13

    Cygnus Status: After discontinuing rendezvous attempts on Monday, Cygnus continues to phase away from ISS on a coelliptic trajectory. As of 10:00 a.m. CDT, Cygnus was trailing ISS 4 km above and 850 km behind.  Uplink of the Relative Global Positioning System (RGPS) Software Patch and associated re-integration of the Cygnus Flight Computers is scheduled …

    Read Full Post

    A View Inside Super Typhoon Usagi

    As category 4 Super Typhoon Usagi churned toward Taiwan on September 19, 2013, a satellite orbiting hundreds of miles above used a radar instrument to map the storm’s inner structure. The instrument on the Tropical Rainfall Measuring Mission (TRMM) observed two tall complexes of rain clouds called hot towers in the inner eyewall, a sign that Usagi was a […]

    Read Full Post

    ISS Daily Summary Report – 09/23/13

    Cygnus Status: On Sunday, the joint operations teams discontinued the nominal rendezvous attempt with ISS when Cygnus’s Relative GPS (RGPS) System was unable to initialize. The problem stems from Cygnus GPS time reference not matching that of the JEM’s GPS time.  The A3 DV burn which was scheduled to occur this morning at 7:29 a.m. CDT …

    Read Full Post