Suggested Searches

Blogs

    ISS Daily Summary Report – 12/09/13

    Cygnus Hardware Command Panel (HCP) and PROX Checkout: This morning, Flight Engineer (FE)–3 Hopkins assembled the HCP and routed power and data  cables from JEM to the Cupola.  Later in the day, he worked with ground teams in order to checkout the HCP and string “B” of the Proximity Communications System (PROX). PROX is a …

    Read Full Post

    ISS Daily Summary Report – 12/06/13

    Ocular Health (OH) Cardiac and Ocular Ultrasounds: FE-6 Wakata and FE-5 Mastrachhio, alternating as the Crew Medical Officer, conducted ocular ultrasound scans of each other as part of each of their Flight Day 30 OH sessions. Mastrachio then performed a cardiac ultrasound of Wakata.  Remote guidance was provided by ground experts to ensure proper positioning …

    Read Full Post

    ISS Daily Summary Report – 12/05/13

    Ocular Health (OH) Optical Coherence Tomography (OCT) Test and Fundoscope Examination:  FE-3 Hopkins, supporting as Crew Medical Officer (CMO), performed OCT tests as part of FE-5 Mastracchio’s and FE-6 Wakata’s Flight Day 30 OH sessions which will continue over the next three days.  Following the OCT examination, Mastracchio and Wakata applied drops to their eyes …

    Read Full Post

    GPM’s Clean Room Mechanics

    The choreography rivals precision aerial acrobats. The teamwork reflects the forward line of a pro football team. This is the vanguard of NASA’s mechanical engineering corps, and to experience them at their full operational power is to gain a profound appreciation for how much more goes into spaceflight than big, booming rockets. Ages range from […]

    Read Full Post

    ISS Daily Summary Report – 12/04/13

    Thermolab Control Unit Battery Compartment Repair:  Flight Engineer (FE)-5 Mastracchio successfully repaired the battery compartment of the Thermolab Control Unit which is used to support ESA’s Circadian Rhythms experiment. Wakata will be scheduled Friday for his Circadian Rhythms session. Cosmo Shoot Live Public Affairs Office (PAO) Event:  FE-6 Wakata set up the JAXA 4K camera …

    Read Full Post

    ISS Daily Summary Report – 12/03/13

    Progress 53P Cargo Ops: Following hatch opening this past Saturday, FE-3 Hopkins and FE-5 Mastracchio completed unpacking and stowing newly arrived USOS items. In total, more than 1400 kg of cargo including a spare Urine Processing Assembly (UPA) Fluids Control Pump Assembly (FCPA) arrived with the vehicle. Cosmo Shoot Rehearsal for Live Public Affairs Office …

    Read Full Post

    ISS Daily Summary Report – 12/02/13

    On-board Training (OBT) Emergency Procedure Review: The ISS Crew and Flight Control Teams reviewed new emergency book procedures and documentation structure. EMER-1a covers Depress, Fire, and Equipment Retrieval procedures.  EMER-1b contains Hazardous Release procedures and EMER-1c contains Ammonia procedures. EMER-2 which includes supplement and ground procedures is only available in electronic form. Spinal Ultrasound Scan …

    Read Full Post

    A Clear View: Operating the Digital Mapping System

    As a Digital Mapping System (DMS) operator, I have a fairly consistent morning ritual to prepare for a day of flying over the ice. This consistency is necessary for both operational integrity and presence of mind while we are attempting to accomplish our mission. I am often apprehensive at the beginning of a daily mission […]

    Read Full Post

    Tanegashima Outside Inside

    Steering wheel on the right side of the car, my windshield wiper slaps back and forth every time I try to signal a turn at an intersection. The controls are opposite their placement in The States, and deeply wired muscle memory is a tough thing to reprogram. I regard each and every moment at an […]

    Read Full Post

    ISS Daily Summary Report – 11/29/13

    53 Progress Docking:  53P was manually docked to the Service Module aft port at 4:30 pm CST. The Progress vehicle launched Monday, November 25 carrying more than 1400 kg of cargo including a spare Urine Processing Assembly (UPA) Fluids Control Pump Assembly (FCPA).  Multi-purpose Small Payload Rack (MSPR) Video Compression And Recording Unit (VCRU) Software …

    Read Full Post