Due to the lapse in federal government funding, NASA is not updating this website.

Suggested Searches

Blogs

    ISS Daily Summary Report – 07/15/13

    New Status: USOS Extravehicular Activity (EVA) #23 Preparations: In preparation for tomorrow’s planned EVA, today is a half duty work day for the USOS crew. Flight Engineer (FE)-3 Cassidy and FE-5 Parmitano completed a final tool configuration which was followed by an independent tool audit by FE-6 Nyberg. Cassidy and Parmitano then prepared the Equipment …

    Read Full Post

    ISS Daily Summary Report – 07/12/13

    New Status: Advanced Colloids Experiment (ACE)-1: Flight Engineer (FE)-6 Nyberg mixed a new sample in  preparation for the 4th of 10 runs planned for Increments 35 and 36. ACE-1 is a series of microscopic imaging investigations that uses the microgravity environment to examine flow characteristics and the evolution and ordering effects within a group of …

    Read Full Post

    ISS Daily Summary Report – 07/11/13

    New Status: USOS Extravehicular Activity (EVA) #23 Preparations: In preparation for USOS EVA #23, planned for next Tuesday, July 16, all three USOS crew members participated in a Dynamic Onboard Ubiquitous Graphics (DOUG) software review. They also reviewed the timeline, briefing package and cribsheet, followed by a conference with ground teams. Flight Engineer (FE)-5 Parmitano …

    Read Full Post

    ISS Daily Summary Report – 07/10/13

    New Status: Post-Extravehicular Activity (EVA) Operations: Today was a half-duty work day for the USOS crew following yesterday’s EVA.  Flight Engineer (FE)-3 Cassidy and FE-5 Parmitano completed their post EVA health evaluation with FE-6 Nyberg acting as Crew Medical Officer (CMO). All 3 USOS crew members participated in an EVA debrief with ground teams. USOS …

    Read Full Post

    ISS Daily Summary Report – 07/09/13

    New Status: USOS Extravehicular Activity (EVA) #22: Flight Engineer (FE)-3 Cassidy (EV-1) and FE-5 Parmitano (EV-2) completed a 6 hour 7 minute EVA with FE-6 Nyberg providing Space Station Remote Manipulator System (SSRMS) support. The following tasks were completed: Remove and replace the Space to Ground Transmitter Receiver Controller (SGTRC)-2 Retrieve Materials International Space Station …

    Read Full Post

    ISS Daily Summary Report – 07/08/13

    New Status: USOS Extravehicular Activity (EVA) #22 Preparations: In preparation for tomorrow’s planned EVA, Flight Engineer (FE)-3 Cassidy and FE-5 Parmitano conducted a final tool configuration followed by an independent tool audit by FE-6 Nyberg. All three crew, plus FE-4 Yurchikhin, completed a final procedures review, and then the USOS crew members participated in a …

    Read Full Post

    ISS Daily Summary Report – 07/05/13

    New Status: Columbus (COL) Water Pump Assembly (WPA)-2 Remove & Replace (R&R) and Commissioning: On January 13, a Thermal Control System (TCS) WPA1 to WPA2 switchover activity was scheduled in support of Water On/Off Valve (WOOV) 1 & 2 periodic cycling. Troubleshooting was conducted but attempts to start WPA-2 were unsuccessful and COL has been …

    Read Full Post

    ISS Daily Summary Report – 07/03/13

    New Status: Extravehicular Activity (EVA) Preparations:  Crewmembers conducted a number of activities in preparation for next Tuesday’s USOS EVA #22. Flight Engineer (FE)-3 Cassidy, FE-5 Parmitano, and FE-6 Nyberg, with assistance from FE-4 Yurchikhin, performed the EVA On-orbit Fit check Verification to verify correct sizing of the EVA Mobility Units (EMUs). Parmitano also checked out …

    Read Full Post

    ISS Daily Summary Report – 07/02/13

    New Status: Automated Transfer Vehicle (ATV)-4 Transfer Operations: Flight Engineer (FE)-3 Cassidy, FE-5 Parmitano, and FE-6 Nyberg have completed 94% of transfer operations as of today.  The crew performed approximately 9 hours of scheduled operations in six hours.  Approximately 5 hours 20 minutes remain of ATV4 cargo operations, which will not be scheduled until after …

    Read Full Post

    ISS Daily Summary Report – 07/01/13

    New Status: Extravehicular Activity (EVA) Prep:  Flight Engineer (FE)-3 Cassidy and FE-5 Parmitano continued with preparations for next week’s EVA #22 scheduled for July 9.  Cassidy relocated hardware from the Airlock not needed for the EVA and prepared the Airlock to support EVA operations.  Both crewmembers completed the Simplified Aid for EVA Rescue (SAFER) On-board …

    Read Full Post