Suggested Searches

Artemis

Viewing Posts from June 2022

View All Posts

    Teams Advance Preparations for Crewed Artemis Missions

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    While teams continue to prepare for the next wet dress rehearsal attempt ahead of Artemis I, engineers and technicians are making headway preparing for future Artemis missions with astronauts. The Orion spacecraft for Artemis II, the first crewed Artemis mission, was powered on for the first time by technicians in the Neil Armstrong Operations and …

    Read Full Post

    CAPSTONE Mission Launch No Longer Targeting June 13

    The capstone spacecraft with solar panels open on either side is lit on one side by the sun. The spacecraft floats in front of a half-darkened lunar surface, with the Earth bright and small in the distant background.

    NASA, Rocket Lab, and Advanced Space are no longer targeting June 13 for the launch of the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment, or CAPSTONE, mission to the Moon. Flight software is being updated. A revised schedule will be provided as soon as possible. Since arriving in New Zealand, CAPSTONE was successfully …

    Read Full Post

    NASA’s Artemis I Moon Rocket Arrives at Launch Pad Ahead of Tanking Test 

    Artemis Logo - red rocket trail, blue arch that represents earth, ARTEMIS text, gray half sphere on a white background

    At approximately 8:20 a.m. EDT, NASA’s Artemis I Moon rocket arrived at the spaceport’s launch complex 39B after an eight-hour journey ahead of the next wet dress rehearsal attempt.   Teams will work to secure the Space Launch System rocket and Orion spacecraft and mobile launcher to ground support equipment at the launch pad and ensure …

    Read Full Post

    Artemis I Rocket Readied for Return to Launch Pad for Tanking Test

    Engineers and technicians at NASA’s Kennedy Space Center are conducting final preparations for next week’s roll out of the Space Launch System (SLS) Moon rocket and Orion spacecraft. Currently scheduled for Monday, June 6, the rocket will depart the Vehicle Assembly Building (VAB) and head to Launch Pad 39B for the Artemis I wet dress …

    Read Full Post

    Gateway’s Propulsion System Testing Throttles Up

    A group of students getting ready to launch a sounding balloon

    The powerhouse of Gateway, NASA’s orbiting outpost around the Moon and a critical piece of infrastructure for Artemis, is in the midst of several electric propulsion system tests. The Power and Propulsion Element (PPE), being manufactured by Maxar Technologies, provides Gateway with power, high-rate communications, and propulsion for maneuvers around the Moon and to transit …

    Read Full Post