ISS Daily Summary Report – 6/09/2023
USOS Extravehicular Activity (EVA) #87 ISS Roll-Out Solar Array (IROSA) 1A Install: Today, Woody Hoburg and Steve Bowen conducted USOS EVA #87 to install and deploy the IROSA 1A. Operators Frank Rubio and Sultan Al Neyadi provided SSRMS M1/M2 support during the EVA. Hatch opening occurred at 8:24 AM CDT. The final Phase Elapsed Time (PET) from today’s EVA was 6 hours and 3 minutes, and the crew completed the following objectives:
- Released IROSA from Flight Support Equipment (FSE)
 - Installed the IROSA on S4 Mast Canister
 - Connected cables and deployed the 1A IROSA
 - Reconfigured the FSE Upper IROSA Support Beams
 
The crew completed the following IROSA 1B get ahead tasks:
- Released R Bolts
 - Removed ARDs
 - Removed Magnet FOD from the lower FSE IROSA
 
Completed Task List Activities:
- None
 
Today’s Ground Activities:
All activities are complete unless otherwise noted.
- S-band Telemetry Housekeeping 1 Preempt
 - EMU Data Recorder (EDAR) Operations
 - IROSA Safing
 - SSRMS Walkoff [Planned]
 
Look Ahead Plan
Saturday, June 10 (GMT 161)
Payloads:
- POLAR2/7 Desiccant Swap
 
Systems:
- EVA Procedure Review
 - EVA Debrief
 - EVA Battery Removal/Installation
 - EMU Water Recharge
 - Robotics EVA Procedure Review
 - EVA Glove Photos
 
Sunday, June 11 (GMT 162)
Payloads & Systems:
- Crew Off Duty
 
Monday, June 12 (GMT 163)
Payloads:
- FSL/Soft Matter Dynamics
 
Systems:
- EVA Procedure Review and Conference
 - Discharge Expired O2 PBAs
 - CSA-CP Checkout Part 1
 - PWD Filter R&R
 - IMV Flow Measurement Survey
 - Transfer Cargo Dragon Cargo Operations
 
Today’s Planned Activities:
All activities are complete unless otherwise noted.
- EVA Communication Configuration
 - EMU Purge
 - EMU In-Suit Light Exercise (ISLE) Pre-breathe
 - Crewlock Depress
 - Crewlock Egress
 - IROSA Release from FSE
 - FSE Worksite Prep and SSRMS Ingress
 - IROSA Install
 - IROSA Deploy
 - Worksite Cleanup
 - SSRMS IROSA Articulating Portable Foot Restraint (APFR) Park
 - Tablet Updating CrewNet Connection
 - Crewlock Ingress
 - Crewlock Repress
 - Post-EVA Activities
 - Internal Audio Subsystem (IAS) EVA Communication Deconfiguration
 - EVA Glove Photo Setup and Downlink
 
			