ISS On-Orbit Status Report

ISS Daily Summary Report – 2/11/2020

Cygnus NG-13 Launch Update: The NG-13 mission is currently scheduled for launch from NASA Wallops Launch Facility on Friday, February 14th at 2:43 pm CT. Cygnus is scheduled for ISS arrival and capture on Sunday, February 16th at 3:40 am CT. Following capture and berthing to the Node 1 nadir port, the crew will ingress S.S. Robert Henry Lawrence Jr and begin the transfer of time critical payloads to the ISS. The NG-13 resupply mission is part of the Commercial Resupply Services-2 (CRS-2) contract.

Payloads:

Bartolomeo preparation: Today, the crew installed the Bartolomeo break out harness installation behind the Human Research Facility (HRF) 2 rack in the Columbus Module COL1A4 location. In order to access the harness installation area behind the rack, the crew cleared stowage from the HRF2 rack front, de-mated the rack service umbilicals, and rotated the rack down. Once the Bartolomeo breakout harness was installed the crew restored the HRF2 rack to its nominal configuration.

Designed to meet user requirements from the commercial and institutional sector, Bartolomeo will be a new external payload hosting facility on the ram side of Columbus that is mechanically attached to the ram-facing primary and secondary trunnions. Bartolomeo offers 12 active payload sites and one passive site, and can accommodate payloads from 5 to 450 kg in mass. The first investigation to use Bartolomeo is expected to be the Multi-Needle Langmuir Probe, an instrument from the University of Oslo and the Norwegian company Eidsvoll Electronics to measure ionospheric plasma densities.

Systems:

Oxygen Generator System (OGS) Activated Carbon/Ion Exchange (ACTEX) Filter Remove and Replace (R&R): Today, the crew performed an activity to draw samples from the OGS Recirculation Loop and R&R of the ACTEX cartridge that provides continuous scrubbing of the OGS Recirculation Loop.

Completed Task List Activities:

  • None

Ground Activities:
All activities are complete unless otherwise noted.

  • Atmosphere Revitalization System (ARS) Lab Major Constituent Analyzer (MCA) Zero Calibration
  • OGS Internal ACTEX R&R and Sample Support
  • Columbus HRF2-Tilt
  • Atmosphere Revitalization System (ARS) Thermal Amine Scrubber (TAS) Calibration Test
  • DC to DC Converter Unit (DDCU) Power Down
  • UPA FCPA Checkout

Wednesday, 2/12 (GMT 043)
Payloads:

  • Actiwatch Plus
  • Mouse Mission-5 prep
  • MELFI sample relocation
  • Microgravity Crystals hardware trash
  • Rodent Research inventory audit

Systems:

  • Installing NH3 Cartridges onto Emergency Masks
  • In Flight Maintenance (IFM) Fluids Control Pump Assembly (FCPA) Hose Remove & Replace
  • Environmental Health System (EHS) Acoustic Monitor and Sampling Ops
  • Systems Operations Data File (SODF) Update
  • Inventory Management System (IMS) Conference

Thursday, 2/13 (GMT 043)
Payloads/Systems:

  • Re-plan in-work due to NG-13 launch slip to NET Friday 2/14

Friday, 2/14 (GMT 044)
Payloads/Systems:

  • Re-plan in-work due to NG-13 launch slip to NET Friday 2/14

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Acoustic Monitor Setup for Crew Worn Measurements
  • Water transfer from Progress 443 (DC1) Rodnik H2O Tank 1 to ЕДВ using pump
  • In Flight Maintenance (IFM) ACTEX Filter Remove and Replace
  • Temperature and Humidity Control (THC) BEAM Intermodule Ventilation (IMV) Flow Measurement Survey
  • Cleanup HRF-2 rotation path.
  • Cleanup of AFT DECK and OVHD AFT Quadrants of Starboard Endcone
  • In Flight Maintenance (IFM) Oxygen Generation System (OGS) Sabatier Removal
  • HRF-2 Rack Tilt Down at COL1A4
  • Bartolomeo cable connection – first part
  • In Flight Maintenance (IFM) Oxygen Generation System (OGS) Stow
  • Environmental Health System (EHS) Potable Water Dispenser (PWD) Sample Collect
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Potable Water Dispenser (PWD) Sample Analysis
  • Wireless Instrumentation System (WIS) Station Support Computer (SSC) Relocate Part 1
  • External Wireless Instrumentation System (EWIS) Network Control Unit (NCU) Connection Troubleshooting
  • Combined Orlan-MKS Nos.4, 5 and БСС cooling loop separation in DC1.
  • Countermeasures System (CMS) Advanced Resistive Exercise Device (ARED) Set Screw Tightening
  • Bartolomeo cable connection – second part
  • HRF-2 Rack Umbilical Mate
  • Countermeasures System (CMS) Advanced Resistive Exercise Device (ARED) 6-Month Maintenance and Pulley Inspection
  • Environmental Health System (EHS) Coliform Water Processing
  • Restore cargo in AFT DECK and OVHD AFT Quadrants of Starboard Endcone
  • Columbus Bay 4 Restore
  • Health Maintenance System (HMS) ISS Food Intake Tracker (ISS FIT)
  • INTERACTION-2. Experiment Ops
  • Photo/TV Camcorder Setup Verification
  • Photo T/V (P/TV) Advanced Resistive Exercise Device (ARED) Exercise Video Stow
  • Acoustic Monitor Battery Swap
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Sample Data Record