Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from January 2017

View All Posts

    ISS Daily Summary Report – 1/17/2017

    Extra-vehicular Mobility Unit (EMU) Loop Scrub:  Today, the crew configured EMUs 3006 and 3008 for loop scrubbing following last week’s EVA. They initiated ionic and particulate filtration (scrubbing) and conducted biocidal maintenance (iodination) on the suit and Airlock cooling water loops.  Samples of the coolant water will be obtained before and after the loop scrub …

    Read Full Post

    ISS Daily Summary Report – 1/16/2017

    Japanese-Small Satellite Orbital Deployer-6 (J-SSOD-6) Deployment: Today four deployers, holding six satellites, were grappled by the JEM Remote Manipulator System (JEMRMS) and deployed.  J-SSOD #6 is the first enhanced J-SSOD, which is able to launch twice the amount of satellites when compared to previous deployers. Photos of each satellite deployment were taken by the crew …

    Read Full Post

    ISS Daily Summary Report – 1/13/2017

    Extravehicular Activity (EVA) #39: Kimbrough and Pesquet opened the Joint Airlock external hatch at 5:22 am CST in order to perform US EVA #39 (Lithium Ion Battery Remove & Replace (R&R) EVA #2). The EVA installs adapter plates and relocates Channel 1A Nickel Hydride (NiH2) batteries to complete the installation of the new Lithium Ion …

    Read Full Post

    ISS Daily Summary Report – 1/12/2017

    Extravehicular Activity (EVA) Preparation:  Today the crew performed final preparation for EMU EVA #39 (Channel 1A Battery R&R). Hatch open is scheduled tomorrow, Friday January 6th at 12:10 GMT (6:10 CST). Earlier today the crew completed the pre-EVA health status exams, final EVA tool configuration and procedure reviews.  Ground specialists and the crewmembers participated in …

    Read Full Post

    ISS Daily Summary Report – 1/11/2017

    Extravehicular Activity (EVA) Preparation:  Today, the USOS crew continued preparing tools that will be used during Friday’s EVA, which will support the upgrade from Nickel Hydride Channel 1A batteries to Lithium Ion batteries. The crew verified that the Simplified Aid for EVA Rescue (SAFERs) are functional, and configured two cameras that will be used during …

    Read Full Post

    ISS Daily Summary Report – 1/10/2017

    Extravehicular Activity (EVA) Preparations:  The crew continued with preparations for the second Battery Upgrade EVA. Today, the crew utilized Dynamic Onboard Ubiquitous Graphics (DOUG) Software to review the translation paths during the upcoming EVA, followed by a conference with ground specialists to answer any questions. Ground teams continued to monitor the discharge of the Channel …

    Read Full Post

    ISS Daily Summary Report – 1/6/2017

    Extravehicular Activity (EVA) #38: The crew opened the Airlock External Hatch at 6:22am CST and performed US EVA #38 (Lithium Ion Battery Remove & Replace (R&R) EVA #1). The Phase Elapsed Time (PET) of the EVA was 6 hours and 32 minutes. The EVA was required to install adapter plates and relocate Channel 3A Nickel …

    Read Full Post

    ISS Daily Summary Report – 1/5/2017

    Extravehicular Activity (EVA) Preparation: Today the crew performed final preparation for EMU EVA #38 (Channel 3A Battery R&R). Hatch open is scheduled tomorrow, Friday January 6th at 12:10 GMT (6:10 CST). Earlier today the crew completed the pre-EVA health status exams, final EVA tool configuration and procedure reviews. Ground specialists and the crewmembers participated in …

    Read Full Post

    ISS Daily Summary Report – 1/4/2017

    Extravehicular Activity (EVA) Preparation:  Today, the USOS crew continued to gather and configure tools that will be used during Friday’s EVA, which will upgrade Nickel Hydride Channel 3A batteries to Lithium Ion batteries. They also configured two cameras that will be used during the EVA. Finally, the crew reviewed procedures associated with EVA. US EVA …

    Read Full Post

    ISS Daily Summary Report – 1/3/2017

    Extravehicular Activity (EVA) Preparations:  The USOS crew continued preparations for Friday’s EVA by auditing and configuring EVA tools, reviewing EVA Cuff Checklist procedures and participating in a conference with ground specialist.  Additionally, they checked out the Rechargeable EVA Battery Assemblies (REBAs) on Extravehicular Mobility Unit (EMU) suits 3006 and 3008 to verify the glove heaters …

    Read Full Post